Shared Housing · Layout Redesign

Shared housing layout redesign in Dubai

A shared housing layout redesign reworks an apartment, villa or building that does not meet the rules, so every bedroom gives 5 m² per person and the required facilities are in place.

What we do

Many shared properties have rooms that are too small, too many people, or missing facilities. We survey the property and redesign the layout: resizing or removing partitions, setting the right number of people per room and providing the kitchen, bathroom, dining, recreation and laundry spaces. Then we prepare the drawings and obtain DCD approval and the DM permit.

5 m²minimum per person in bedrooms
Facilitieskitchen, bathroom, dining, recreation, laundry
Partitionsresized, moved or removed
Approvedby DCD and Dubai Municipality

Shared housing layout redesign: what is included

  • Bedrooms: resize or combine rooms to meet 5 m² per person
  • Facilities: add or free up dining, recreation and laundry space
  • Partitions: move or remove walls, checked by our engineers
  • Escape routes: keep exits clear for the DCD drawings
  • Category: one category per unit: individual or family
  • Drawings: new layout and fire safety drawings for approval

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

Questions about shared housing layout redesign

When is a layout redesign needed?

When rooms are below 5 m² per person, facilities are missing, or partitions block escape routes.

Will I lose capacity?

Occupancy is set by the rules. We design the layout to reach the highest legal number for the property.

Do you supervise the changes on site?

We prepare the design and drawings and check that the built layout matches before approval.

Is the redesign approved by an authority?

Yes. The new layout goes to DCD and to Dubai Municipality for the shared accommodation permit.

Related guides

Keep reading