Shared housing approval for tenants in Dubai
Shared housing approval for tenants: if you rent a Dubai apartment or villa and want to run it as shared accommodation, you can apply with a NOC from the owner, and we handle the rest.
What we do
A tenant applies with the tenancy contract and a NOC from the owner; the owner NOC is enough, no building-management NOC is needed. We check the area, survey the property, set the legal occupancy at 5 m² per person, prepare the layout and fire safety drawings and obtain DCD approval and the Dubai Municipality permit.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Shared housing approval for tenants: what is included
- Documents: tenancy contract, owner NOC, Emirates ID, affection plan
- Area: must be one of the 39 areas on the DM list
- Category: individual or family housing, not both
- Layout: rooms and facilities to the DM rules
- Fire safety: DCD drawings prepared by our team
- Permit: the DM shared accommodation permit in the tenant's application
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner NOC (tenants) Owner | A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
Questions about shared housing approval for tenants
Can a tenant apply for a shared housing permit?
Yes, with a NOC from the owner. The owner NOC is enough.
Do I need the building management's NOC?
No, only the owner NOC is needed.
Can I rent out rooms in my flat without the permit?
No. Shared accommodation needs the DM permit and DCD approval, and only in the allowed areas.
What does the owner need to sign?
A NOC allowing the property to be used as shared accommodation. We can tell you what it should cover.
Related guides
