Shared housing fire safety drawings for DCD
Shared housing fire safety drawings are what Dubai Civil Defence (DCD) reviews before approving a shared apartment, villa or building. Our team prepares them in-house and submits them for approval.
What we do
Every shared housing property needs DCD approval. We prepare the fire and life safety drawings from our site survey, showing escape routes, fire detection and alarm, emergency lighting and exit signs, firefighting equipment and fire-rated partitions where needed, then submit them to DCD and follow the approval through.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Shared housing fire safety drawings: what is included
- Escape routes: exits, corridors and doors from every bedroom
- Detection and alarm: fire alarm and detectors as DCD requires
- Emergency lighting: emergency lights and exit signs
- Equipment: extinguishers and other firefighting equipment
- Partitions: fire rating of partition walls where needed
- Submission: we submit to DCD and handle comments
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner NOC (tenants) Owner | A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
Questions about shared housing fire safety drawings
Does shared housing need Civil Defence approval?
Yes. DCD approval is required for every shared housing property, together with the Dubai Municipality permit.
Who prepares the fire safety drawings?
Our team prepares them in-house and submits them to DCD.
What do the drawings show?
Escape routes, detection and alarm, emergency lighting and exit signs, firefighting equipment and partition fire ratings, as DCD requires for the property.
What if DCD has comments?
We revise the drawings and resubmit until the approval is issued.
Related guides
