Where is shared housing allowed in Dubai? The full area list
Shared housing allowed areas in Dubai: 28 areas where it is fully allowed and 11 where it is allowed in designated parts only, under the Dubai Municipality circular.
The short answer
The Dubai Municipality circular (reported by Khaleej Times on 8 October 2026) lists where shared housing is allowed. It is fully allowed in 28 areas, including Karama, Oud Metha, Al Barsha 1, Jumeirah 1, Al Qusais, Al Nahda 1 and 2, Al Rigga and Al Warqa 1. It is allowed only in designated parts of 11 more, including Al Satwa, Mankhool, Al Jafiliya and Al Mamzar. On Bani Yas Road, Sheikh Zayed Road, Jumeirah Road and Al Wasl Road, only family housing is allowed. Areas not on the list, such as Dubai Marina, JLT and Downtown, are not included.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Shared housing allowed areas: what you need to know
- Fully allowed: Shared housing is allowed in all parts of the area.
- Partly allowed: Only in designated parts; we check your plot.
- Family-only roads: Bani Yas, Sheikh Zayed, Jumeirah and Al Wasl roads.
- Not on the list: Shared housing is not allowed there.
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
All 39 areas on the Dubai Municipality list
Source: Dubai Municipality circular, reported by Khaleej Times on 8 October 2026. Family housing only on Bani Yas, Sheikh Zayed, Jumeirah and Al Wasl roads.
| Area | Approval route | Guides |
|---|---|---|
| Al Ras Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Dhagaya (Deira) Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Bateen Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Sabkha Fully allowed | Shared housing allowed in all parts of the area. | — |
| Eyal Nasser Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Murar Fully allowed | Shared housing allowed in all parts of the area. | — |
| Naif Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Rigga Fully allowed | Shared housing allowed in all parts of the area. | Al Rigga guide |
| Al Muteena Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Muraqqabat Fully allowed | Shared housing allowed in all parts of the area. | — |
| Rigga Al Buteen Fully allowed | Shared housing allowed in all parts of the area. | — |
| Hor Al Anz Fully allowed | Shared housing allowed in all parts of the area. | Hor Al Anz guide |
| Al Waheda Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Rashidiya Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Nahda 1 Fully allowed | Shared housing allowed in all parts of the area. | Al Nahda guide |
| Al Nahda 2 Fully allowed | Shared housing allowed in all parts of the area. | Al Nahda guide |
| Al Qusais Fully allowed | Shared housing allowed in all parts of the area. | Al Qusais guide |
| Al Twar 5 Fully allowed | Shared housing allowed in all parts of the area. | — |
| Muhaisnah 4 Fully allowed | Shared housing allowed in all parts of the area. | — |
| Souq Al Kabeer Fully allowed | Shared housing allowed in all parts of the area. | — |
| Umm Hurair 1 and 2 Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Raffa Fully allowed | Shared housing allowed in all parts of the area. | — |
| Karama Fully allowed | Shared housing allowed in all parts of the area. | Karama guide |
| Oud Metha Fully allowed | Shared housing allowed in all parts of the area. | Oud Metha guide |
| Jumeirah 1 Fully allowed | Shared housing allowed in all parts of the area. | Jumeirah 1 guide |
| Al Bada'a Fully allowed | Shared housing allowed in all parts of the area. | — |
| Al Barsha 1 Fully allowed | Shared housing allowed in all parts of the area. | Al Barsha 1 guide |
| Al Warqa 1 Fully allowed | Shared housing allowed in all parts of the area. | Al Warqa 1 guide |
| Abu Hail Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Baraha Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Hamriya Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Mankhool Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Jafiliya Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Hudaiba Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Satwa Partly allowed | Allowed only in designated parts; we check your plot. | Al Satwa guide |
| Port Saeed Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Hor Al Anz East Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Mamzar Partly allowed | Allowed only in designated parts; we check your plot. | — |
| Al Qusais Industrial 1 to 5 Partly allowed | Allowed only in designated parts; we check your plot. | — |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
More questions about shared housing allowed areas
Is Al Quoz on the list?
No, Al Quoz is not on the DM list.
Is Mirdif on the list?
No, Mirdif is not on the list.
How do I check a partly allowed area?
Send us the plot number; we check it.
Is Dubai Marina allowed?
No, Dubai Marina is not on the list.
Related guides
