العربيةShared Housing · Permit

What is the shared accommodation permit in Dubai?

The shared accommodation permit is the Dubai Municipality permit to operate a property as shared housing, required under the new DM rules.

The short answer

Under the new rules (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026), a property used as shared housing needs a permit to operate as shared accommodation. The permit is for a property in an allowed area, set up as either individual or family housing, with bedrooms of at least 5 m² per person and the required kitchen, bathroom, dining, recreation and laundry facilities. Civil Defence (DCD) approval is also required. Owners apply, or tenants with the owner NOC. Structural Solutions prepares the drawings and handles the application.

Issued byDubai Municipality
Also neededDCD approval
ApplicantOwner, or tenant with owner NOC

Shared accommodation permit: what you need to know

  • Allowed area: The property must be in an area on the DM list.
  • Layout drawings: Show rooms, occupancy and facilities.
  • DCD: Fire and life safety approval is required.
  • Existing properties: Must regularise by 8 September 2027.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about shared accommodation permit

Who issues the permit?

Dubai Municipality.

Can a tenant apply?

Yes, with a NOC from the owner.

Do I need drawings?

Yes, layout drawings showing rooms, occupancy and facilities.

What if I operate without a permit?

Fines from AED 500 to AED 500,000 under the circular.

Related guides

Keep reading