العربيةShared Housing · Facilities

What facilities must shared housing have in Dubai?

Shared housing facilities in Dubai must include a kitchen, a bathroom, a dining area, a recreation area and laundry facilities, under the DM rules.

The short answer

The DM circular (reported by Khaleej Times on 8 October 2026) requires appropriate kitchen, bathroom, dining, recreation and laundry facilities in shared housing. These are shown on the layout drawings submitted for the permit, together with the bedrooms at 5 m² per person. Civil Defence (DCD) approval covers the fire and life safety side. We check the existing layout and propose changes where a facility is missing.

KitchenRequired
BathroomRequired
Dining, recreation, laundryRequired

Shared housing facilities: what you need to know

  • Kitchen: Appropriate for the number of occupants.
  • Bathrooms: Appropriate for the occupants.
  • Dining and recreation: Shared areas, not only bedrooms.
  • Laundry: A laundry facility is required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about shared housing facilities

Can a bedroom double as recreation space?

The circular lists recreation as a separate facility.

Do I need a laundry room?

Laundry facilities are required.

Who checks the facilities?

Dubai Municipality, on the drawings and inspection.

Can you redesign the layout?

Yes, we propose the layout changes.

Related guides

Keep reading