Shared Housing · Room Size

The 5 m² per person rule for shared housing in Dubai

Under the 5 m² per person rule, every bedroom in Dubai shared housing must give each occupant at least five square metres.

The short answer

The DM circular (reported by Khaleej Times on 8 October 2026) sets a minimum bedroom area of 5 m² per person. A 10 m² bedroom can therefore hold at most two people, and a 15 m² bedroom at most three, before considering the other rules. The property must also have a kitchen, bathroom, dining, recreation and laundry facilities. Our layout drawings measure each bedroom and show the occupancy, which is what the DM permit reviews.

Minimum5 m² per person
Applies toBedrooms
Checked onLayout drawings

5 m² per person: what you need to know

  • Simple maths: Bedroom area divided by 5 = maximum occupants.
  • Measured area: We measure each room on site.
  • Facilities too: Kitchen, bathroom, dining, recreation, laundry.
  • Overcrowding: Exceeding occupancy risks fines.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about 5 m² per person

How many people in a 12 m² room?

Two, since three would need 15 m².

Does the hall count?

The rule is for bedrooms.

Do partitions change the area?

Yes, each partitioned room must meet the rule and be approved.

Who measures the rooms?

We survey and draw them.

Related guides

Keep reading