Dubai Hills Villa Types and Extension Guide
Dubai Hills villa types and extension guide: villa and townhouse sizes vary by sub-community, so how much you can add is checked against your villa’s Emaar as-built plans, not a generic figure.
Dubai Hills Estate has many villa and townhouse sub-communities, such as Maple, Sidra, Club Villas, Golf Place, Parkway Vistas, Fairways, Emerald Hills, Palm Hills and Golf Grove. Layouts and sizes vary between them, so we don’t use generic type figures. Emaar provides the as-built plans; we measure your villa from them and on site. There is no fixed extension figure we can promise for Dubai Hills Estate. Emaar Community Management reviews each extension against your villa’s approved plans and the community guidelines, and we check your villa before you design.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing floor area: measured from the Emaar as-built plans and on site, so the design matches what Emaar can approve.
- Unapproved works: older changes are surveyed and approved before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in Dubai Hills Estate
- Title deed and owner ID
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Who does what
The approval route in Dubai Hills Estate
Dubai Hills Estate villas follow Emaar first, then the Dubai Development Authority (DDA) permit for structural works. We confirm the route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides. | — |
| Emaar NOC Emaar Community Management | NOC. Emaar reviews the design and confirms its fees. | Emaar extension fees |
| Permit Dubai Development Authority (DDA) | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Emaar and Dubai Development Authority (DDA) | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Development Authority (DDA) | Completion certificate that closes the permit; Emaar then closes its file. | — |
How it works
How it works in Dubai Hills Estate
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Emaar as-built plans, a site check, drawings and stamped calculations where needed.
We get it approved
Emaar NOC, then the Dubai Development Authority (DDA) permit where the works are structural.
Guides for works in Dubai Hills Estate
What each work needs in Dubai Hills Estate
- Extension: Emaar NOC, Dubai Development Authority (DDA) permit and stamped calculations
- Wall removal: structural check, Emaar NOC and Dubai Development Authority (DDA) permit
- Balcony closure: Emaar NOC and Dubai Development Authority (DDA) permit; it adds floor area
- Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Emaar NOC, Dubai Development Authority (DDA) permit and the DM environmental NOC
- External colour or façade: Emaar NOC
- Internal finishes only: usually no permit; check with Emaar first
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions owners ask in Dubai Hills Estate
Which sub-communities does this cover?
The villa and townhouse sub-communities of Dubai Hills Estate. Third-party plots follow their own design approval.
Is there a fixed extension size per villa type?
No published figure we can rely on. Emaar Community Management reviews each extension against the villa’s approved plans and the community guidelines.
How is my villa’s area measured?
From the Emaar as-built plans and a site check.
Who approves an extension?
Emaar gives the NOC, then the Dubai Development Authority (DDA) issues the building permit for structural works.
Can you check my villa before I design?
Yes. Send the villa number and photos and we check what is likely to be approved.