The Springs Extension and Renovation Costs: 2026 Guide
One page with the typical costs for the jobs Springs owners ask about most: kitchen extensions, study rooms, back terraces, balcony closures and internal renovations, plus the Emaar fees most quotes leave out.
In The Springs, extensions typically cost about AED 800 to 1,500 per sq ft to build, and Emaar adds AED 1,000 per sq ft of new floor area for townhouses, within a 10% allowance. Internal renovations typically cost about AED 150 to 300 per sq ft basic, AED 350 to 600 mid-range and AED 700 to 1,000 or more premium, with no floor area fee. The Emaar NOC is AED 2,000 and the Dubai Municipality permit about AED 1,000 to 2,000. We plan the work and prepare drawings so every contractor prices the same job.


At a glance
Typical costs in The Springs
Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.
| Work | Typical construction cost | Emaar floor area fee | Guide |
|---|---|---|---|
| Kitchen extension | About AED 800 to 1,500/sq ft | AED 1,000/sq ft | kitchen extension cost |
| New study room | About AED 800 to 1,500/sq ft | AED 1,000/sq ft | study room cost |
| Study from existing space | About AED 350 to 600/sq ft | None | study room cost |
| Enclosed back terrace | About AED 800 to 1,500/sq ft | AED 1,000/sq ft | back terrace extension cost |
| Balcony closure | Glass usually lower; masonry up to about AED 1,500/sq ft | AED 1,000/sq ft | balcony closure cost |
| Internal renovation | About AED 150 to 1,000+/sq ft by level | None | internal renovation cost |
What quotes leave out
The costs owners often miss
| Item | Typical amount |
|---|---|
| Emaar floor area fee on extensions | AED 1,000 per sq ft of new floor area |
| Emaar NOC | AED 2,000 |
| Refundable Emaar deposit | AED 10,000 |
| Dubai Municipality permit | Approx. AED 1,000 to 2,000 |
| Fine if works start without NOC and permits | AED 10,000 to 50,000 |
Before you budget
Useful Springs guides
| Topic | Guide |
|---|---|
| How much bigger your villa can be | how much bigger a Springs villa can be |
| Springs villa types | Springs villa types |
| Extension fees explained | Springs extension fees |
| Full approvals guide | Springs renovation approvals guide |
Official sites: Dubai Municipality
What you need to know
- Extensions: about AED 800 to 1,500/sq ft.
- Emaar fee: AED 1,000/sq ft new area.
- Renovation: about AED 150 to 1,000+/sq ft.
- One set of drawings for fair quotes.
Documents you will need
- Photos of the area to change
- Villa type and number
- Title deed
- Your idea or a sketch
How it works
From idea to a price you can trust
1. Photos
Send your idea.
2. Check
What your villa allows.
3. Design
Drawings to price.
4. Quotes
Contractors price it.
5. Approvals
Emaar and DM.
6. Works
Build starts.

Questions
Springs costs: questions
How much does it cost to extend a Springs villa?
Typically about AED 800 to 1,500 per sq ft to build, plus Emaar’s AED 1,000 per sq ft fee on the new floor area for townhouses.
How much does a Springs renovation cost?
About AED 150 to 300 per sq ft basic, AED 350 to 600 mid-range and AED 700 to 1,000 or more premium.
What do contractor quotes usually leave out?
The Emaar floor area fee, the NOC, the deposit and the Dubai Municipality permit. Our pages list them so your budget is complete.
How do I get an accurate price?
Send us photos and your idea. We check what your villa allows and prepare drawings that contractors price like for like.
How much is your fee?
Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.
Who can help?
Structural Solutions plans Springs extensions and renovations, prepares the drawings contractors price and secures the Emaar NOC and Dubai Municipality permit. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
