The Springs · Cost guide · Updated November 2026

How Much Does a Back Terrace Extension Cost in The Springs?

Turning the back garden into a covered terrace or an enclosed garden room is a popular way to gain space in a Springs townhouse. The cost depends mostly on one thing: whether it stays open or becomes a closed room.

A back terrace in The Springs costs much less when it stays open: a pergola or shade structure is a separate, simpler job. Enclosing the terrace into a room is an extension, typically about AED 800 to 1,500 per sq ft to build, and new floor area attracts Emaar’s AED 1,000 per sq ft fee for Springs townhouses. An enclosed terrace counts as new floor area, so budget for the fee. We check the design and prepare the drawings contractors price.

Open pergolaSeparate, simpler job
Enclosed roomAbout AED 800 to 1,500/sq ft
Floor areaCounts as new floor area
Street of townhouses in The Springs, Emirates Living, Dubai
The Springs, Emirates Living, Dubai
How Much Does a Back Terrace Extension Cost in The Springs?

Options

Open or enclosed: what changes

Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.

OptionTypical costApproval
Pergola or shade over the terraceLower; depends on the material and sizeEmaar NOC, see Springs pergola NOC
Enclosed terrace room (walls, windows, roof)About AED 800 to 1,500 per sq ftEmaar NOC and Dubai Municipality permit
Example: 150 sq ft enclosed terrace roomAED 120,000 to 225,000 for the worksPlus AED 150,000 Emaar floor area fee (150 sq ft x AED 1,000)

What changes the price

What pushes the cost up or down

FactorEffect
Open or closedClosing it in adds walls, glazing, AC and the floor area fee
Roof typeA concrete slab costs more than a light roof
GlazingLarge sliding glass panels are a big part of the cost
FoundationsNew walls need footings

Official fees

Official fees on top of the works (November 2026)

Emaar and Dubai Municipality set these and can change them.

ItemFee
Emaar NOCAED 2,000 total, including the AED 500 submission fee
Emaar added floor area (GFA) fee, Springs townhousesAED 1,000 per sq ft of new floor area, within the 10% allowance
Emaar security depositAED 10,000, refunded after clearance of the job
Dubai Municipality permitApprox. AED 1,000 to 2,000
Emaar fine for works without NOC and permitsAED 10,000 to 50,000

All costs

Springs cost guides

WorkGuide
Kitchen extensionkitchen extension cost
Study roomstudy room cost
Internal renovationinternal renovation cost
Back terrace extensionback terrace extension cost
Balcony closurebalcony closure cost
All costs in one placeSprings extension and renovation costs

Official sites: Dubai Municipality

What you need to know

  • Open pergola: the lower-cost option.
  • Enclosed room: about AED 800 to 1,500/sq ft.
  • Floor area fee: AED 1,000/sq ft once enclosed.
  • We check before you budget.

Documents you will need

  • Photos of the back garden
  • Villa and plot number
  • Title deed
  • Your idea or a sketch

How it works

How to price your back terrace

1. Photos

Send the garden.

2. Option

Open or enclosed.

3. Design

Drawings to price.

4. Quotes

Contractors price it.

5. Approvals

Emaar and DM.

6. Build

Works start.

How Much Does a Back Terrace Extension Cost in The Springs?

Questions

Springs terrace cost: questions

How much does a back terrace extension cost in The Springs?

An open pergola is the lower-cost option. Enclosing the terrace into a room typically costs about AED 800 to 1,500 per sq ft to build.

Does an enclosed terrace count as extra floor area?

Yes. Once the terrace is enclosed it counts as new floor area, so Emaar’s AED 1,000 per sq ft fee applies for Springs townhouses, within the 10% allowance.

Can I build a garden room instead?

Possibly. See garden room in The Springs.

How much is your fee?

Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.

Who can help?

Structural Solutions designs Springs terraces and garden rooms, prepares the drawings contractors price and secures the approvals. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.