How Do I Repair Concrete Spalling in My Building in Dubai?
Pieces of concrete falling off, rust stains or exposed steel bars on a balcony, soffit, column or car park. That is spalling. Here is how it is repaired properly in Dubai.
Concrete spalling is usually caused by the steel bars inside rusting and pushing the concrete off. The repair is: an engineer assesses the extent, a testing laboratory carries out the tests our engineers choose, a repair design is prepared, and a specialist contractor removes the damaged concrete, treats the steel and reinstates it. Where strengthening is needed, the authority asks for a concrete restoration or strengthening specialist stamp. Structural Solutions assesses, designs and follows the file until the final approval.
Signs
Signs of spalling and what they mean
| Sign | What it usually means |
|---|---|
| Rust stains on concrete | Steel bars starting to corrode |
| Cracks along a beam or column | Rust is pushing the cover off |
| Concrete pieces falling | Advanced spalling; keep the area clear |
| Exposed steel bars | Section loss; strengthening may be needed |
Repair
How the repair is done
| Stage | What happens |
|---|---|
| Assessment | Survey; see building condition survey |
| Testing | See concrete testing of an existing building |
| Design | Repair method, materials and any strengthening |
| Approval | Developer or building NOC and authority approval where needed |
| Works | Specialist contractor, supervised by us |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Do not just patch over rusting steel.
- Tests show how far it goes.
- Specialist contractor repairs.
- Strengthening: specialist stamp.
Documents you will need
- Photos of the spalling
- Building location and age
- Existing drawings, if any
- Building management contact
How it works
How we handle spalling repair
1. Photos
Send them.
2. Survey
Extent of damage.
3. Tests
Laboratory.
4. Design
Repair method.
5. Works
Supervised.
6. Close
Final approval where needed.
Questions
Concrete spalling: questions
How do I repair concrete spalling in my building?
Get an engineer assessment and repair design, then a specialist contractor removes the damaged concrete, treats the steel and reinstates it.
Is concrete spalling dangerous?
It can be. Falling pieces are a hazard and steel loss reduces strength, so have it assessed.
Can I just plaster over spalling?
No. The rusting steel keeps pushing the new plaster off.
Who pays in a tower: the owner or the owners association?
Common areas usually fall to the owners association. See tower concrete restoration for owners associations.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions assesses spalling, designs the repair and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.