Who Can Stamp Steel Calculations for Trakhees?
Steel works in Trakhees areas such as JAFZA, Palm Jumeirah, Jumeirah Park, Al Furjan and JVC go to Trakhees CED for approval. Here is who stamps what, and how Structural Solutions gets both stamps on the file.
For Trakhees CED approval, the steel calculations and drawings are prepared and stamped by the consultant, and Trakhees also asks for a steel specialist or approved steel contractor stamp on the steel. Structural Solutions prepares the steel calculations as your consultant, coordinates the steel specialist stamp and follows the file with Trakhees CED until the final approval.
Who stamps what
Who stamps what for Trakhees CED
| Document | Stamped by |
|---|---|
| Steel structural calculations | The consultant |
| Structural drawings | The consultant |
| Steel design and fabrication drawings | A steel specialist or approved steel contractor accepted by Trakhees |
| Fire safety | Dubai Civil Defence (DCD) where the works need it |
Areas
Trakhees areas and steel works
| Area | Typical steel works | Guide |
|---|---|---|
| JAFZA | Mezzanines, warehouse extensions, sheds, racking platforms | JAFZA steel structure calculations |
| Palm Jumeirah, Jumeirah Park, Al Furjan | Pergolas, canopies, staircases, steel frame extensions | Trakhees approvals |
| JVC and Jebel Ali Village | Villa and townhouse steel works | Trakhees approvals |
Related
Related Trakhees steel questions
| Question | Guide |
|---|---|
| Does Trakhees accept calculations from any engineer? | does Trakhees accept calculations from any engineer |
| Who can stamp calculations for JAFZA? | who can stamp calculations for JAFZA |
| Mezzanine in a Trakhees area | Trakhees CED mezzanine approval |
| Approved steel contractor | approved steel contractor |
Official sites: Trakhees
What you need to know
- Two stamps: consultant plus steel specialist.
- Trakhees CED approves building and structural works.
- DCD where fire safety applies.
- We coordinate until final approval.
Documents you will need
- Developer or landlord NOC (Nakheel, JAFZA)
- Steel drawings or concept
- Site photos
- Contractor details
How it works
How we get steel calculations stamped for Trakhees
1. Brief
Works and plot.
2. Calculations
Prepared by us.
3. Steel stamp
Coordinated.
4. Trakhees CED
Submission and comments.
5. Final approval
We follow it.
Questions
Trakhees steel stamp questions
Who can stamp steel calculations for Trakhees?
The consultant stamps the calculations and drawings, and Trakhees also asks for a steel specialist or approved steel contractor stamp on the steel.
Does Trakhees ask for a steel specialist stamp?
Yes. Steel works need a steel specialist or approved steel contractor stamp in addition to the consultant calculations.
Can Structural Solutions do both?
We prepare the calculations and coordinate the steel specialist stamp, then follow the file until the final approval. See steel calculations and stamp from one team.
Is JAFZA approved by Trakhees?
Yes. JAFZA building and structural works are approved by Trakhees CED.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions prepares steel calculations for Trakhees CED, coordinates the steel specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
