Post-tensioned slabs · Design · Dubai

Post-Tensioned Car Park Slab Design in Dubai

Long spans, fewer columns, more parking.

Car parks benefit from post-tensioned slabs: longer spans mean fewer columns and better layouts. Our engineers design the slab system, tendon layout, drainage falls and durability details, and coordinate with the ramps and services for the authority submission.

What we check first

  • Slab: PT or reinforced concrete
  • Tendons: Layout and profile
  • Loads: Use, finishes, services
  • Openings: Size and position
  • Records: As-built and tendon drawings
  • Approval: Building management and authority

Documents you will need

  • Building name and unit or plot number
  • As-built structural and tendon drawings, if available
  • Photos of the slab and the area
  • What you want to design, open, core or fix

Route

How it works, step by step

Each project is reviewed first; the route follows the property and the authority.

StepApproval routeGuides
Records
Building management or developer
As-built structural and tendon layout drawings.—
Check
Our engineers
Slab type, tendon positions and the proposed change or design.Is my slab PT?
Scanning
Specialist
Tendon scanning on site before any coring or drilling, where needed.Coring a PT slab
Design
Structural Solutions
PT design or assessment, drawings and stamped calculations.—
Approval
Building management and authority
NOC and permit for structural works.—
Works
Contractor and PT specialist
To the approved drawings.—

How it works

How it works

1. Send the details

Building, unit, drawings, photos.

2. Records

As-built and tendon drawings.

3. Check

Slab type and tendon positions.

4. Design

PT design or assessment.

5. Approval

NOC and permit.

6. Works

Contractor and PT specialist.

Post-tensioned slab?

Check it first

Send us three things on WhatsApp:

  1. Building and unit or plot number
  2. Tendon or structural drawings, if you have them
  3. What you want to do

Our engineers design PT slabs and assess openings, coring and repairs in existing PT slabs.

Questions

Questions

Why PT for car parks?

Longer spans and fewer columns.

Does durability matter?

Yes, car parks need durability details.

Do you coordinate ramps?

Yes, with the structure.

Which authority approves?

The authority for the area.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading