Coring or Drilling a Post-Tensioned Slab in Dubai

Never core or drill a PT slab without locating the tendons.

Coring or deep drilling into a post-tensioned slab can hit a tendon. Before any coring, the tendon positions are confirmed from the drawings and by scanning on site, and the core position is checked by an engineer. Our engineers review the request and confirm safe positions, and the works need building management approval.

What we check first

  • Slab: PT or reinforced concrete
  • Tendons: Layout and profile
  • Loads: Use, finishes, services
  • Openings: Size and position
  • Records: As-built and tendon drawings
  • Approval: Building management and authority

Documents you will need

  • Building name and unit or plot number
  • As-built structural and tendon drawings, if available
  • Photos of the slab and the area
  • What you want to design, open, core or fix

Route

How it works, step by step

Each project is reviewed first; the route follows the property and the authority.

StepApproval routeGuides
Records
Building management or developer
As-built structural and tendon layout drawings.—
Check
Our engineers
Slab type, tendon positions and the proposed change or design.Is my slab PT?
Scanning
Specialist
Tendon scanning on site before any coring or drilling, where needed.Coring a PT slab
Design
Structural Solutions
PT design or assessment, drawings and stamped calculations.—
Approval
Building management and authority
NOC and permit for structural works.—
Works
Contractor and PT specialist
To the approved drawings.—

How it works

How it works

1. Send the details

Building, unit, drawings, photos.

2. Records

As-built and tendon drawings.

3. Check

Slab type and tendon positions.

4. Design

PT design or assessment.

5. Approval

NOC and permit.

6. Works

Contractor and PT specialist.

Post-tensioned slab?

Check it first

Send us three things on WhatsApp:

  1. Building and unit or plot number
  2. Tendon or structural drawings, if you have them
  3. What you want to do

Our engineers design PT slabs and assess openings, coring and repairs in existing PT slabs.

Questions

Questions

Can I drill for anchors?

Shallow fixings may be allowed in safe zones; check first.

What is tendon scanning?

A site scan that locates tendons before coring.

Who allows coring?

Building management, with an engineer’s check.

What if a tendon was hit?

Stop the works and get an engineering assessment.