Post-Tensioned Slab Design in Dubai
PT slabs for buildings, podiums and car parks, designed and coordinated.
We design post-tensioned slabs: the slab system, tendon layout and profiles, reinforcement and the calculations, coordinated with the architecture and services. PT slabs allow longer spans and thinner slabs. We prepare the drawings for the authority submission and coordinate with the PT specialist contractor.

Official sources: Dubai Municipality, Dubai Development Authority (DDA), Trakhees
What we check first
- Slab: PT or reinforced concrete
- Tendons: Layout and profile
- Loads: Use, finishes, services
- Openings: Size and position
- Records: As-built and tendon drawings
- Approval: Building management and authority
Documents you will need
- Building name and unit or plot number
- As-built structural and tendon drawings, if available
- Photos of the slab and the area
- What you want to design, open, core or fix
Route
How it works, step by step
Each project is reviewed first; the route follows the property and the authority.
| Step | Approval route | Guides |
|---|---|---|
| Records Building management or developer | As-built structural and tendon layout drawings. | — |
| Check Our engineers | Slab type, tendon positions and the proposed change or design. | Is my slab PT? |
| Scanning Specialist | Tendon scanning on site before any coring or drilling, where needed. | Coring a PT slab |
| Design Structural Solutions | PT design or assessment, drawings and stamped calculations. | — |
| Approval Building management and authority | NOC and permit for structural works. | — |
| Works Contractor and PT specialist | To the approved drawings. | — |
How it works
How it works
1. Send the details
Building, unit, drawings, photos.
2. Records
As-built and tendon drawings.
3. Check
Slab type and tendon positions.
4. Design
PT design or assessment.
5. Approval
NOC and permit.
6. Works
Contractor and PT specialist.
Related questions
- Opening in a Post-Tensioned Slab in Dubai: Assessment and Design
- How Do I Know If My Slab Is Post-Tensioned?
- Coring or Drilling a Post-Tensioned Slab in Dubai
- Post-Tensioned vs Reinforced Concrete Slab in Dubai
- Cut Tendon in a Post-Tensioned Slab: What to Do
- Fixing Into a Post-Tensioned Slab During Fit-Out
- Post-Tensioned Slab Shop Drawings Review in Dubai
- Post-Tensioned Car Park Slab Design in Dubai
What causes problems
- Coring or drilling without locating the tendons
- Cutting a tendon
- Openings without a structural design
Post-tensioned slab?
Check it first
Send us three things on WhatsApp:
- Building and unit or plot number
- Tendon or structural drawings, if you have them
- What you want to do
Our engineers design PT slabs and assess openings, coring and repairs in existing PT slabs.
Questions
Questions
Do you design PT slabs?
Yes, the slab design, tendon layout and calculations.
Who installs the tendons?
A PT specialist contractor, to the approved design.
Where are PT slabs used?
Towers, podiums, car parks and long-span floors.
Do you also assess existing PT slabs?
Yes, for openings, coring and repairs.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
