Car Park Structural Drawings Dubai | RTA & DM Submission Package

RTA and Dubai Municipality both require structural drawings as part of car park approval — covering foundation, column and beam layout, slab reinforcement, and ramp design. Structural Solutions prepares complete structural drawing packages for car park submissions across Dubai.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What's Included in a Structural Drawing Package

A complete package includes foundation and footing layout, column and beam schedules, slab reinforcement drawings, ramp structural details, and — for basement parking — retaining wall and waterproofing detail drawings, all prepared to the format RTA and DM require.

Structural Drawing Process

01

Site Survey & As-Built Verification

02

Structural Design & Calculations

03

Drawing Preparation

04

Internal QA Review

05

Authority-Format Formatting

06

Submission-Ready Package

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Common Reasons for New Drawings

New or updated structural drawings are typically needed for a new car park build, a multi-storey extension of an existing structure, or where original drawings are missing, outdated, or don't match current RTA/DM submission format requirements.

Drawing Package Scope

New Car Park

Full structural drawing set from foundation to roof/top deck

Extension

Existing structure verification plus new-level drawings

As-Built Update

Site-surveyed drawings where originals are missing

Car Park Structural Drawings Dubai at a Glance

StepWhoWhat happens
1Structural engineerSurveys the site and prepares drawings to the format of the developer and the authority.
2Master developerNot needed on standalone Dubai Municipality villa plots — required in master-developer communities.
3Building authority — Dubai MunicipalityBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

Key Technical Rules

  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.
Structural Solutions Engineering Team Reviewing Approval Documents

Format

RTA and DM submission-ready

Authority Format

DM, DDA, Trakhees

PDF + DWG

Ready to submit

Highly rated

By our clients

Why Choose Structural Solutions

Submission-Ready Format

Drawings prepared to the exact format RTA and DM expect, avoiding formatting-related rejections.

Full Car Park Coverage

Foundation, column/beam, slab, and ramp drawings handled as one coordinated package.

From Drawings to Approval

We can take your drawing package straight into RTA parking approval submission.

Structural Solutions prepares RTA and DM-ready structural drawing packages for car parks across Dubai.

Get Free Consultation

Car Park Structural Drawings — FAQs

Do I need new drawings if my car park already has old ones?

Depends on their age and format — we review existing drawings first and update only what's needed.

What format do RTA and DM require?

Specific layer, scale, and stamping requirements apply — we prepare drawings to match exactly.

Can you produce drawings from a site survey alone?

Yes — where no original drawings exist, we conduct an as-built survey and produce drawings from that.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works — we confirm the approvals needed and prepare the submission.

Do you handle the RTA submission too?

Yes — we can manage the complete process from drawings through RTA approval.