Car Park Structural Assessment in Dubai
We check whether an existing or proposed car park, surface, basement or multi-storey, can carry its loads, and prepare stamped calculations for the approval.
The short answer
A car park structural assessment checks the slabs, beams, columns, ramps and foundations of an existing or proposed car park against the vehicle loads and its use. It is needed when a car park is built, extended, changed or found damaged. The structural submission goes to the building authority for the area, Dubai Municipality, DDA or Trakhees, while the parking count, layout and access are reviewed by RTA as part of the parking approval.
What you need to know
- Existing car parks: Surveyed and checked for the current use.
- Changes: New ramps, openings or extra levels.
- Damage: Cracks or corrosion assessed.
- Parking layout: Reviewed by RTA, not part of the structural check.
Documents you will need
- Existing drawings, if any
- Site survey
- Proposed car park layout
- Use and vehicle types
How it works
How we prepare it
1. Review
The car park, its use and the drawings available.
2. Survey
Existing structure surveyed where needed.
3. Design or assessment
Structural checks and calculations.
4. Drawings
Foundations, columns, slabs, ramps.
5. Stamp
Calculations and drawings stamped.
6. Submission
To the building authority; parking layout to RTA.
Who does what
Who approves a car park
Building authority
Dubai Municipality, DDA or Trakhees approves the structure of the car park.
Structural calculations →What we prepare
- Assessment report
- Stamped calculations
Why plot access applications get returned
- Drawings that do not match the site
- Missing calculations for ramps or slabs
- Parking layout not matching the RTA-reviewed layout
Questions
Questions villa owners ask
Who approves a car park structure?
The building authority for the area: DM, DDA or Trakhees.
What does RTA review?
The parking count, layout and access.
Can an existing car park take extra loads?
It is checked with a structural assessment first.
Related guides
