Shop merging · Your question

Can I Merge a Shop and an Office Unit?

Two units, two different uses. Here is what that adds.

Possibly. Joining units with different uses means the merged unit needs one approved use, so a change of use is added to the merging route. The building and the authority decide whether the combined use is allowed, and Civil Defence checks the fire safety for it. We check the building and the uses first.

PossiblyWith a change of use
DecidesBuilding and authority
PlusFire safety for the use

What decides it

  • Uses: Retail and office
  • Building: Allowed uses
  • Change of use: For one unit
  • Fire safety: For the combined use

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

Related guides

What stops a merge

  • Use not allowed in the building
  • No change of use
  • Fire safety for the wrong use

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Is it more complex than two shops?

Yes, the change of use is added.

Can the office become retail?

If the building and authority allow it.

Can you check first?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading