Shop merging · Civil Defence

Civil Defence (DCD) Approval for Merged Shops

Two small shops become one bigger space, and the fire safety must work for the new size.

DCD for merged shops

Yes, a merged shop needs Civil Defence approval. The bigger unit changes the occupancy, the travel distances to the exits and the coverage of the alarms and sprinklers. If one entrance is closed, the remaining exits must still be enough. We design the fire safety for the merged layout and handle the DCD approval and inspection.

NeededYes
ChecksExits, alarms, sprinklers
Ends withDCD inspection

What Civil Defence checks

  • Exits: Enough for the merged unit
  • Travel distance: To the nearest exit
  • Alarms: Detection coverage
  • Sprinklers: Layout under the new ceiling
  • Signs and lighting: Exit signs and emergency lighting

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

What stops a merge

  • Closing an exit that is needed
  • Sprinklers not adjusted
  • No updated fire drawings

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Can I close one of the two doors?

Only if the remaining exits are enough. We check it.

Do sprinklers need to change?

Usually, when the wall and ceiling change.

What if the inspection fails?

The points are fixed and re-inspected.