Can I Merge Two Shops in Dubai?
You have found the shop next door. Here is whether you can join them.
Usually yes, for two adjacent shops. What decides it is the building management's agreement, the wall between the units, the fire exits for the merged shop and the approval of the authority for the area. Shops with different owners need both owners' consent. We check your units and tell you how realistic it is before you commit.

Official sources: Dubai Municipality · DDA · Dubai Civil Defence · DEWA · Dubai Land Department
What decides it
- Building: Its rules and NOC
- Wall: Load-bearing or not
- Exits: For the merged shop
- Owners: Same or different
- Area: DM, DDA or another authority
Documents you will need
- Title deeds, or the tenancy contracts with the owner's written NOC
- Unit numbers and building name
- Existing drawings of both units, if available
- Photos of the wall between the units
Route
The shop merging route
The general route. We confirm it for your building and area.
| Step | Approval route | Guides |
|---|---|---|
| NOC Owner or landlord, and building management | Approval of the merge by the owner or landlord and the building management or developer. | Combination NOC |
| Structural check Consultant | We check the wall between the units and design the opening. | Party wall assessment |
| Authority approval The authority for the area | We submit the merging drawings as your consultant. | — |
| Civil Defence (DCD) DCD | Fire and life safety for the merged layout: exits, alarms, sprinklers. | DCD for merged shops |
| Utilities DEWA | Meters and load for the merged unit, where needed. | DEWA meters |
| Completion Authority and DCD | Inspection and completion. The title deeds can then be updated at DLD where the owner wants it. | Title deed |
How it works
How we take your merge to completion
1. Send us the details
Area, building, both unit numbers and photos.
2. We confirm the route
NOC, authority and DCD for your building.
3. Structural check
The wall between the units.
4. Drawings
Merged layout, structure, fire safety, MEP.
5. Approvals
We submit and follow up.
6. Works and completion
By your contractor, then inspection.
Related guides
- shop-merging-approval-dubai
- Merging two retail units
- Can I merge shops with different owners?
What stops a merge
- Building management refusing
- A wall that cannot be opened
- Exits lost in the merge
Merging two units?
Get your route confirmed
Send us three things on WhatsApp:
- The area, building and both unit numbers
- Photos of the wall between the units
- Shop, office or restaurant
We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.
Questions
Questions
Do the shops need to be next to each other?
Yes, for a normal merge.
Can you check before I sign a lease?
Yes.
How long does shop merging take?
It depends on the building, the area, the structure and the approvals involved. We review your case and tell you.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides