Can I Merge a Shop With the Unit Above It?

Going up instead of sideways: a duplex shop needs a new opening in the slab.

Possibly. Joining a shop with the unit above means cutting an opening in the floor slab for a staircase, which is a structural change checked by an engineer and approved by the authority, after the owner and building NOC. Civil Defence checks the stair and the exits on both levels. We check whether the slab can be opened and design it.

PossiblyWith a slab opening
ChecksSlab and stair
PlusExits on both levels

What decides it

  • Slab: Can it be opened?
  • Stair: Size and position
  • Exits: From both levels
  • Building: Its NOC

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

What stops a merge

  • Slab that cannot be opened
  • No second exit upstairs
  • Building refusing

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Is a slab opening always possible?

No, it depends on the slab and beams. We check it.

Is a mezzanine an alternative?

Sometimes. See our guide.

Who approves it?

The building first, then the authority and Civil Defence.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.