Do I Need a Structural Engineer to Merge Two Units?
The wall between two units looks simple. It is not always.
Yes. The wall between two units can carry load from the floors above, hide a column, or be part of the fire separation. A structural engineer checks it, designs the opening or any beam needed, and prepares the calculations that the building and the authority ask for. We do this as part of the merging approval.

Official sources: Dubai Municipality · DDA · Dubai Civil Defence · DEWA · Dubai Land Department
What decides it
- Load: From above
- Columns: In the wall
- Opening: Size and support
- Calculations: For the approval
Documents you will need
- Title deeds, or the tenancy contracts with the owner's written NOC
- Unit numbers and building name
- Existing drawings of both units, if available
- Photos of the wall between the units
Route
The shop merging route
The general route. We confirm it for your building and area.
| Step | Approval route | Guides |
|---|---|---|
| NOC Owner or landlord, and building management | Approval of the merge by the owner or landlord and the building management or developer. | Combination NOC |
| Structural check Consultant | We check the wall between the units and design the opening. | Party wall assessment |
| Authority approval The authority for the area | We submit the merging drawings as your consultant. | — |
| Civil Defence (DCD) DCD | Fire and life safety for the merged layout: exits, alarms, sprinklers. | DCD for merged shops |
| Utilities DEWA | Meters and load for the merged unit, where needed. | DEWA meters |
| Completion Authority and DCD | Inspection and completion. The title deeds can then be updated at DLD where the owner wants it. | Title deed |
How it works
How we take your merge to completion
1. Send us the details
Area, building, both unit numbers and photos.
2. We confirm the route
NOC, authority and DCD for your building.
3. Structural check
The wall between the units.
4. Drawings
Merged layout, structure, fire safety, MEP.
5. Approvals
We submit and follow up.
6. Works and completion
By your contractor, then inspection.
Related guides
- shop-merging-approval-dubai
- Party wall removal assessment
- The party wall is load-bearing
What stops a merge
- Removing the wall first
- No calculations
- Cutting a column
Merging two units?
Get your route confirmed
Send us three things on WhatsApp:
- The area, building and both unit numbers
- Photos of the wall between the units
- Shop, office or restaurant
We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.
Questions
Questions
Is it needed for a small opening?
Yes, any opening in the wall is checked.
What if there are no drawings?
We investigate on site.
Do you also do the approvals?
Yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.