Party Wall Removal for Shop Merging: Structural Assessment

The wall between two shops decides how open the merged unit can be. Here is how it is checked.

Party wall assessment

Before the wall between two units is removed or opened, a structural engineer checks whether it carries any load from above, what is inside it (columns, services, fire separation), and how a new opening should be supported. Where the wall is load-bearing, a beam, new columns or a partial opening may be designed. The assessment and calculations are part of the merging approval.

ChecksLoad, columns, services
If load-bearingBeam or partial opening
Part ofThe merging approval

What we check in the wall

  • Load: Does it carry the floor above?
  • Columns: Inside or next to the wall
  • Services: Pipes and cables
  • Fire separation: Was it a fire wall?
  • Opening: Size and support

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

What stops a merge

  • Removing the wall before the check
  • No drawings of the building
  • Cutting through a column

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Are walls between shops usually load-bearing?

Often not, but it must be checked for each building.

What if there are no drawings?

We investigate on site.

Can part of the wall stay?

Yes, a partial opening is common.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.