Can a Tenant Merge Two Leased Shops?

Many merges are done by tenants. Here is what a tenant needs.

Yes, with the landlord's written NOC for both units and the building management's approval. The same route then applies: structural check, authority approval and Civil Defence. Agree with the landlord what happens at the end of the lease. We apply as your consultant.

NeedsLandlord NOC for both
ThenSame route
AgreeWhat happens at lease end

What decides it

  • Landlord: Written NOC
  • Building: NOC
  • Leases: Both units
  • Approvals: Through us

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

Related guides

What stops a merge

  • No landlord NOC
  • Different lease terms for the units
  • Starting before approval

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Can I apply without the landlord?

No, the landlord's written NOC is needed.

Who applies for the approvals?

We do, as your consultant.

Do both units need the same landlord?

No, but each landlord must agree.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.