Can I Close One of the Two Entrance Doors After Merging?

One shop, two doors. Here is when one can be closed.

Possibly. Closing an entrance is a fire safety question and a shopfront question. Civil Defence checks that the remaining exits are enough for the merged unit, and the building management approves the change to the shopfront. Sometimes the second door must stay as an exit even if it is not used as an entrance. We check it in the design.

PossiblyIf exits remain enough
ChecksCivil Defence
ShopfrontBuilding approval

What decides it

  • Exits: Enough for the occupancy
  • Travel distance: To the nearest exit
  • Shopfront: Building rules
  • Use: Entrance or exit only

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Owner or landlord, and building management
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
The authority for the area
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

Related guides

What stops a merge

  • Closing a needed exit
  • Changing the shopfront without NOC
  • Blocking the door with displays

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Can the second door be emergency exit only?

Often yes. We design it.

Can it be replaced with glass?

Shopfront changes need the building approval.

Does DCD inspect it?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.