Calia Beach Collection Tilal Al Ghaf NOC: approvals for villa changes
Calia Beach Collection Tilal Al Ghaf NOC: approvals for extensions, pools, landscaping and other changes to Calia Beach Collection homes. Any change to the villa needs the Majid Al Futtaim (MAF) NOC, then a DDA building permit for structural or external works. We prepare the drawings and handle both.
Calia Beach Collection is a sub-community of Tilal Al Ghaf, the Majid Al Futtaim master community. Calia Beach Collection is one of the newer Tilal Al Ghaf launches. Every home improvement needs the MAF NOC first, and major works (layout changes, balcony enclosures, ground-floor extensions, pools) then need a DDA building permit. The MAF Home Improvement Guidelines set the limits: pergolas open and no higher than 2.8 m, pools at least 1.20 m from the boundary wall, rear balconies only partially enclosed, and no garage conversions or façade cladding. A pool also needs the Dubai Municipality environmental NOC. The cost depends on the works, so we review your idea and advise.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality (pool environmental NOC)
Calia Beach Collection Tilal Al Ghaf NOC: what needs approval
- Extensions: Same outside look only
- Balcony: Partial rear enclosure only
- Swimming pools: 1.20 m from the boundary wall
- Pergolas and gazebos: Open, max 2.8 m, 80 cm from the wall
- Interior: Kitchens, bathrooms, layouts
- Not permitted: Garage conversion, cladding, full balcony enclosure
Documents you will need
- Title deed and owner ID
- Villa type and photos
- Plans from your handover documents (or we survey)
- Drawings and calculations (we prepare these)
- Owner letter for sign-off
By type of work
Calia Beach Collection Tilal Al Ghaf NOC by type of work
The route is the same: MAF NOC first, then DDA where the works need a permit.
| Work | Approval route | Guides |
|---|---|---|
| Extension MAF NOC → DDA permit | Must keep the same outside look of the villa. | Extensions |
| Garden suite MAF NOC → DDA permit | Possible for most villas, not all. | Garden suites |
| Swimming pool MAF NOC → DDA + DM environmental NOC | At least 1.20 m from the boundary wall; deck max 30 cm above ground. | Pools |
| Pergola, gazebo or awning MAF NOC | Open, max 2.8 m high, at least 80 cm from the boundary wall. | Pergolas |
| Balcony MAF NOC → DDA permit | Partial enclosure of the rear balcony only. | Balconies |
| Garage or carport conversion Not permitted | Carports are for parking; a light cover is allowed. | Carport covers |
How it works
How we get your works approved
1. Review
Your idea, photos and plans.
2. Check
Villa type, plot and guidelines.
3. Drawings
Drawings and calculations.
4. MAF NOC
We apply for you.
5. DDA permit
Building permit for the works.
6. Sign-off
Inspection, completion, deposit back.
What Calia Beach Collection owners ask us about
Common reasons for MAF or DDA comments
- Works outside the MAF Home Improvement Guidelines
- Structures closer than 80 cm to the boundary wall
- Drawings that do not match the home
- Works started before the NOC
Planning works in Calia Beach Collection?
Send your idea. We check what is possible.
Send us three things on WhatsApp:
- What you want to change
- Photos of the villa
- Plans from your handover documents, if you have them
We tell you what is possible for your villa type, the approvals needed and the cost for your scope.
Questions
Calia Beach Collection Tilal Al Ghaf NOC questions
Who approves villa changes in Calia Beach Collection, Tilal Al Ghaf?
Two approvals. First the Majid Al Futtaim (MAF) NOC, then a DDA building permit for structural and external works. We prepare the drawings and handle both.
Is Calia Beach Collection under Dubai Municipality or DDA?
DDA. Like the rest of Tilal Al Ghaf, Calia Beach Collection is approved by the Dubai Development Authority after the MAF NOC, not by Dubai Municipality. The only Dubai Municipality step is the environmental NOC for a swimming pool.
My Calia Beach Collection home is new. Can I change it after handover?
Yes, with approval: the MAF NOC first, then the DDA permit. Keep your handover plans as the base for the drawings.
How do I apply for the MAF NOC for my Calia Beach Collection home?
We prepare the drawings and apply for the MAF NOC for you.
Can I extend my Calia Beach Collection home?
Yes, if the outside look of the home stays the same. MAF does not allow changes to the external look of the villa, so an extension must match the existing design, materials and colours and must not block the neighbour's view. Cladding or a new façade design is not permitted. An extension adds GFA and is a major work: MAF NOC, then a DDA permit.
Can I add a garden suite in Calia Beach Collection?
Garden suites are possible for most Tilal Al Ghaf villas, but not all. It counts as added GFA and needs the MAF NOC, then a DDA building permit. We check your villa type and plot.
Can I close my balcony in Calia Beach Collection?
Partially, and only the rear balcony. Full enclosure of balconies is not permitted. A partial enclosure is allowed where there is a concrete slab above, it does not block the neighbour's view and it keeps the design of the homes uniform.
Can I convert the garage or carport into a room in Calia Beach Collection?
No. The MAF guidelines do not permit converting the carport into storage or living space: carports are for parking only. You can add a lightweight cover to the carport if it is not visible from the street, sits below the carport parapet and matches the louvre colour.
Can I build a pool, pergola or gazebo in Calia Beach Collection?
Yes, with approval. Pergolas and gazebos must be open, no higher than 2.8 m and at least 80 cm from the boundary wall, and gazebos go in the back garden only. A pool must be at least 1.20 m from the boundary wall, with a safety fence and the deck no more than 30 cm above ground. A pool also needs the Dubai Municipality environmental NOC for the backwash.
When can contractors work in Calia Beach Collection?
Between 9am and 5pm, not on weekends or public holidays. A copy of the MAF NOC must be posted on the front door or wall during the works, and the contractor needs a contractor access permit from MAF.
Where do I get the plans of my Calia Beach Collection villa?
Use the plans from your handover documents. If you do not have them, we survey the villa and prepare as-built drawings for the NOC.
The previous owner made changes in my Calia Beach Collection villa. Are they approved?
Check the approved drawings and the NOC for those works. If there are none, the works need to be regularised before sale or new works. We check and advise.
What happens if I start works in Calia Beach Collection without the NOC?
The works can be stopped, and you may have to regularise or remove them. Unapproved works can also cause problems when you sell. Get the MAF NOC first.
Do the same rules apply across Tilal Al Ghaf?
Yes. The MAF Home Improvement Guidelines apply across Tilal Al Ghaf: the same limits for pergolas, pools, balconies and extensions, and the same route: MAF NOC, then DDA for major works.
How do I get sign-off for works in Calia Beach Collection?
After the works and once the site is cleared, book the MAF inspection. For major works, MAF refunds the security deposit after you submit the DDA building permit, the approved drawings and the completion certificate. We prepare and obtain these.
How much does a Calia Beach Collection NOC and permit cost?
It depends on the works and the scope: an extension is not a pergola. Send us your idea, photos and any drawings you have, and we review them and advise.
What do you need from me to start?
Your title deed, the villa type, photos, any drawings you have, and a short description of what you want to change. We confirm what is possible and the approvals needed.