Tilal Al Ghaf · Serenity

Serenity Tilal Al Ghaf NOC: approvals for villa changes

Serenity Tilal Al Ghaf NOC: approvals for extensions, garden suites, pools and other changes to Serenity villas. Any change to the villa needs the Majid Al Futtaim (MAF) NOC, then a DDA building permit for structural or external works. We prepare the drawings and handle both.

Serenity is a sub-community of Tilal Al Ghaf, the Majid Al Futtaim master community. Serenity homes are family villas. Every home improvement needs the MAF NOC first, and major works (layout changes, balcony enclosures, ground-floor extensions, pools) then need a DDA building permit. The MAF Home Improvement Guidelines set the limits: pergolas open and no higher than 2.8 m, pools at least 1.20 m from the boundary wall, rear balconies only partially enclosed, and no garage conversions or façade cladding. A pool also needs the Dubai Municipality environmental NOC. The cost depends on the works, so we review your idea and advise.

Master developerMajid Al Futtaim (MAF)
Developer NOCWe apply for you
Building permitDDA
CostDepends on the works
Serenity Tilal Al Ghaf NOC villa approvals

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality (pool environmental NOC)

Serenity Tilal Al Ghaf NOC: what needs approval

  • Extensions: Same outside look only
  • Balcony: Partial rear enclosure only
  • Swimming pools: 1.20 m from the boundary wall
  • Pergolas and gazebos: Open, max 2.8 m, 80 cm from the wall
  • Interior: Kitchens, bathrooms, layouts
  • Not permitted: Garage conversion, cladding, full balcony enclosure

Documents you will need

  • Title deed and owner ID
  • Villa type and photos
  • Plans from your handover documents (or we survey)
  • Drawings and calculations (we prepare these)
  • Owner letter for sign-off

By type of work

Serenity Tilal Al Ghaf NOC by type of work

The route is the same: MAF NOC first, then DDA where the works need a permit.

WorkApproval routeGuides
Extension
MAF NOC → DDA permit
Must keep the same outside look of the villa.Extensions
Garden suite
MAF NOC → DDA permit
Possible for most villas, not all.Garden suites
Swimming pool
MAF NOC → DDA + DM environmental NOC
At least 1.20 m from the boundary wall; deck max 30 cm above ground.Pools
Pergola, gazebo or awning
MAF NOC
Open, max 2.8 m high, at least 80 cm from the boundary wall.Pergolas
Balcony
MAF NOC → DDA permit
Partial enclosure of the rear balcony only.Balconies
Garage or carport conversion
Not permitted
Carports are for parking; a light cover is allowed.Carport covers

How it works

How we get your works approved

1. Review

Your idea, photos and plans.

2. Check

Villa type, plot and guidelines.

3. Drawings

Drawings and calculations.

4. MAF NOC

We apply for you.

5. DDA permit

Building permit for the works.

6. Sign-off

Inspection, completion, deposit back.

Common reasons for MAF or DDA comments

  • Works outside the MAF Home Improvement Guidelines
  • Structures closer than 80 cm to the boundary wall
  • Drawings that do not match the home
  • Works started before the NOC

Planning works in Serenity?

Send your idea. We check what is possible.

Send us three things on WhatsApp:

  1. What you want to change
  2. Photos of the villa
  3. Plans from your handover documents, if you have them

We tell you what is possible for your villa type, the approvals needed and the cost for your scope.

Questions

Serenity Tilal Al Ghaf NOC questions

Who approves villa changes in Serenity, Tilal Al Ghaf?

Two approvals. First the Majid Al Futtaim (MAF) NOC, then a DDA building permit for structural and external works. We prepare the drawings and handle both.

Is Serenity under Dubai Municipality or DDA?

DDA. Like the rest of Tilal Al Ghaf, Serenity is approved by the Dubai Development Authority after the MAF NOC, not by Dubai Municipality. The only Dubai Municipality step is the environmental NOC for a swimming pool.

What is the difference between Serenity and Harmony in Tilal Al Ghaf?

They are different sub-communities of Tilal Al Ghaf with their own villa types. The approval route is the same: MAF NOC, then a DDA permit.

How do I apply for the MAF NOC for my Serenity home?

We prepare the drawings and apply for the MAF NOC for you.

Can I extend my Serenity home?

Yes, if the outside look of the home stays the same. MAF does not allow changes to the external look of the villa, so an extension must match the existing design, materials and colours and must not block the neighbour's view. Cladding or a new façade design is not permitted. An extension adds GFA and is a major work: MAF NOC, then a DDA permit.

Can I add a garden suite in Serenity?

Garden suites are possible for most Tilal Al Ghaf villas, but not all. It counts as added GFA and needs the MAF NOC, then a DDA building permit. We check your villa type and plot.

Can I close my balcony in Serenity?

Partially, and only the rear balcony. Full enclosure of balconies is not permitted. A partial enclosure is allowed where there is a concrete slab above, it does not block the neighbour's view and it keeps the design of the homes uniform.

Can I convert the garage or carport into a room in Serenity?

No. The MAF guidelines do not permit converting the carport into storage or living space: carports are for parking only. You can add a lightweight cover to the carport if it is not visible from the street, sits below the carport parapet and matches the louvre colour.

Can I build a pool, pergola or gazebo in Serenity?

Yes, with approval. Pergolas and gazebos must be open, no higher than 2.8 m and at least 80 cm from the boundary wall, and gazebos go in the back garden only. A pool must be at least 1.20 m from the boundary wall, with a safety fence and the deck no more than 30 cm above ground. A pool also needs the Dubai Municipality environmental NOC for the backwash.

When can contractors work in Serenity?

Between 9am and 5pm, not on weekends or public holidays. A copy of the MAF NOC must be posted on the front door or wall during the works, and the contractor needs a contractor access permit from MAF.

Where do I get the plans of my Serenity villa?

Use the plans from your handover documents. If you do not have them, we survey the villa and prepare as-built drawings for the NOC.

The previous owner made changes in my Serenity villa. Are they approved?

Check the approved drawings and the NOC for those works. If there are none, the works need to be regularised before sale or new works. We check and advise.

What happens if I start works in Serenity without the NOC?

The works can be stopped, and you may have to regularise or remove them. Unapproved works can also cause problems when you sell. Get the MAF NOC first.

Do the same rules apply across Tilal Al Ghaf?

Yes. The MAF Home Improvement Guidelines apply across Tilal Al Ghaf: the same limits for pergolas, pools, balconies and extensions, and the same route: MAF NOC, then DDA for major works.

How do I get sign-off for works in Serenity?

After the works and once the site is cleared, book the MAF inspection. For major works, MAF refunds the security deposit after you submit the DDA building permit, the approved drawings and the completion certificate. We prepare and obtain these.

How much does a Serenity NOC and permit cost?

It depends on the works and the scope: an extension is not a pergola. Send us your idea, photos and any drawings you have, and we review them and advise.

What do you need from me to start?

Your title deed, the villa type, photos, any drawings you have, and a short description of what you want to change. We confirm what is possible and the approvals needed.

Related guides

Keep reading