Shared Housing · Questions

What if my area is not allowed for shared housing in Dubai?

If your area is not allowed for shared housing on the Dubai Municipality list, the property should be rented as a single unit, not shared.

The short answer

Shared housing is allowed only in the 39 areas on the DM list (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026). In other areas, such as Dubai Marina, JLT, Downtown, Al Quoz or Mirdif, the property cannot be used as shared accommodation, and existing shared use should stop or move. Operating shared housing there risks fines from AED 500 to AED 500,000. If your area is partly allowed, we check whether your plot is in the designated part.

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Area is not allowed for shared housing: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about area is not allowed for shared housing

Can I apply for an exception?

The circular does not describe exceptions.

What about partly allowed areas?

We check your plot.

Is Mirdif allowed?

No, Mirdif is not on the list.

Can I rent to one family?

Renting as a single unit is not shared housing.

Related guides

Keep reading