Walls · Structural · Approvals

Wall Opening Structural Assessment in Dubai

The assessment answers one question: what can this wall take?

A structural assessment for a wall opening looks at the wall, the slab or beams above, the floors and walls carried, and the supports at each side. It sets out whether an opening is possible, how wide, and what beam, lintel or columns it needs. The assessment is the base for the design and the approval drawings.

What we check first

  • Wall: Load-bearing or partition
  • Structure: Slab, beams, columns above
  • Material: Block, concrete or precast
  • Opening: Width and position
  • Records: As-built drawings or survey
  • Route: NOC, then authority

Documents you will need

  • Photos of the wall from both sides, and the ceiling above
  • Villa or unit number and community or building
  • As-built drawings, if you have them
  • Title deed and owner ID, or tenancy for shops and offices

Route

How a wall change is approved

The structural check comes first. The NOC and permit follow the area and the property type.

StepApproval routeGuides
Structural check
Our engineers
As-built drawings, or a site survey, to confirm whether the wall carries load.Is my wall load-bearing?
Design
Structural Solutions
Beam or lintel design, stamped structural calculations and drawings.—
NOC
Developer, landlord or building management
Villas in a community: developer NOC. Apartments, offices and shops: building management or landlord NOC.—
Permit
The authority for the area
DM, DDA, Trakhees or the area authority, for the structural works.Wall opening permit
Works
Your contractor
To the approved drawings, with temporary propping where needed.—
Completion
Authority and developer
Inspection and completion of the works.Wall opening sign-off

How it works

How it works

1. Send photos

The wall, the ceiling and what you want.

2. Records

As-built drawings, or a survey.

3. Structural check

Load-bearing or not, and what is above.

4. Design

Beam or lintel, stamped calculations.

5. NOC and permit

Developer, landlord or BM, then the authority.

6. Works and completion

Propping, works, inspection.

Planning a wall change?

Check the wall first

Send us three things on WhatsApp:

  1. Photos of the wall and the ceiling above
  2. Your community or building, and unit number
  3. What you want to open or remove

Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.

Questions

Questions

What does the assessment look at?

The wall, the loads above and the supports.

Is a site visit needed?

Usually, together with the as-built drawings.

Can the assessment say no?

Yes, if the wall cannot safely take the opening; we suggest alternatives.

How is it used?

For the design, the NOC and the permit.

Can you open the finishes?

A small inspection opening may be needed to see the wall.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.