Living Room Wall Opening NOC in Dubai: Opening to the Dining or Majlis
A wider living area usually means a wider opening, and a bigger beam.
Opening the living room to the dining room, the majlis or the hall usually means a wide opening in a ground floor wall. If the wall carries the floor above, the beam is long and may need columns at the ends. Our engineers check the wall, design the opening or an arch, and handle the developer or building management NOC and the permit.

Official sources: Dubai Municipality, Dubai Development Authority (DDA)
What we check first
- Wall: Load-bearing or partition
- Structure: Slab, beams, columns above
- Material: Block, concrete or precast
- Opening: Width and position
- Records: As-built drawings or survey
- Route: NOC, then authority
Documents you will need
- Photos of the wall from both sides, and the ceiling above
- Villa or unit number and community or building
- As-built drawings, if you have them
- Title deed and owner ID, or tenancy for shops and offices
Route
How a wall change is approved
The structural check comes first. The NOC and permit follow the area and the property type.
| Step | Approval route | Guides |
|---|---|---|
| Structural check Our engineers | As-built drawings, or a site survey, to confirm whether the wall carries load. | Is my wall load-bearing? |
| Design Structural Solutions | Beam or lintel design, stamped structural calculations and drawings. | — |
| NOC Developer, landlord or building management | Villas in a community: developer NOC. Apartments, offices and shops: building management or landlord NOC. | — |
| Permit The authority for the area | DM, DDA, Trakhees or the area authority, for the structural works. | Wall opening permit |
| Works Your contractor | To the approved drawings, with temporary propping where needed. | — |
| Completion Authority and developer | Inspection and completion of the works. | Wall opening sign-off |
How it works
How it works
1. Send photos
The wall, the ceiling and what you want.
2. Records
As-built drawings, or a survey.
3. Structural check
Load-bearing or not, and what is above.
4. Design
Beam or lintel, stamped calculations.
5. NOC and permit
Developer, landlord or BM, then the authority.
6. Works and completion
Propping, works, inspection.
Related wall questions
What causes problems
- A wide opening without columns where they are needed
- Beams that drop below the door height
- Applying room by room instead of one layout
Planning a wall change?
Check the wall first
Send us three things on WhatsApp:
- Photos of the wall and the ceiling above
- Your community or building, and unit number
- What you want to open or remove
Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.
Questions
Questions
How wide can the opening be?
It depends on the loads and the beam depth that fits.
Can I have an arch?
Yes, it is designed like any other opening.
Will the beam show?
Sometimes; the design looks at the ceiling depth.
Do I need the authority permit?
For load-bearing walls, yes.
Can you join several rooms?
Yes, in one set of drawings.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
