Floor load · Strong rooms

Strong Room and Vault Structural Assessment in Dubai

Strong rooms and vault doors are among the heaviest items in any fit-out. Banks, jewellers and family offices need the floor checked before they go in. Here is what we assess.

Strong room assessment

A strong room adds heavy walls, a vault door and safes to an existing floor. We run the structural analysis of the slab from the as-built drawings for the full layout, design steel bases and anchoring where needed, and check the delivery route and lift for the vault door. You receive a full report for building management, the project’s consultant or the authorities.

Heavy itemsWalls, vault door and safes
Based onThe as-built drawings
You receiveA full report

What we assess

  • Strong room walls: Weight along the floor
  • Vault door: Large concentrated load
  • Safes inside: Point loads
  • Delivery: Route and lift for the door

Documents you will need

  • Strong room layout
  • Vault door and safe datasheets
  • As-built drawings, if available

How it works

How the assessment works

1. Item details

Weight, footprint and datasheet.

2. As-built drawings

We obtain or review them.

3. Analysis

Slab capacity against the added load.

4. Load spreading

Steel base or spreader plate and anchoring, if needed.

5. Route and lift

Delivery path and lift capacity.

6. Full report

Detailed analysis for review.

Related guides

  • Safe installation floor load
  • Office floor load
  • Load spreading plate
  • Delivery route and lift check

Common problems

  • Vault door delivered before the route check
  • Walls added without checking the slab
  • Safes grouped mid-span

Need a floor load check?

Check the floor before delivery

Send us three things on WhatsApp:

  1. The item, its weight and footprint (datasheet)
  2. The area, the floor and where the item will sit
  3. As-built drawings, if you have them

We run the analysis from the as-built drawings, design the spreader plate and anchoring if needed, check the route and the lift, and send you the full report.

Questions

Strong room questions

Does a strong room need a structural assessment?

Yes, the walls, the door and the safes add heavy loads to the floor.

Do you check the vault door delivery?

Yes, the route and the lift.

Who reviews the report?

Building management, the project’s consultant or the authorities.