Lintel Design for New Doors and Windows in Dubai

Even a door-sized opening needs a lintel that suits the wall.

A lintel is the short beam over a door or window opening. In block walls, it carries the blockwork and any slab load above; in concrete walls, the opening needs a framed design. Our engineers size the lintel, its bearing length and material, steel, concrete or precast, and include it in the calculations for the NOC and the permit.

What we check first

  • Wall: Load-bearing or partition
  • Structure: Slab, beams, columns above
  • Material: Block, concrete or precast
  • Opening: Width and position
  • Records: As-built drawings or survey
  • Route: NOC, then authority

Documents you will need

  • Photos of the wall from both sides, and the ceiling above
  • Villa or unit number and community or building
  • As-built drawings, if you have them
  • Title deed and owner ID, or tenancy for shops and offices

Route

How a wall change is approved

The structural check comes first. The NOC and permit follow the area and the property type.

StepApproval routeGuides
Structural check
Our engineers
As-built drawings, or a site survey, to confirm whether the wall carries load.Is my wall load-bearing?
Design
Structural Solutions
Beam or lintel design, stamped structural calculations and drawings.—
NOC
Developer, landlord or building management
Villas in a community: developer NOC. Apartments, offices and shops: building management or landlord NOC.—
Permit
The authority for the area
DM, DDA, Trakhees or the area authority, for the structural works.Wall opening permit
Works
Your contractor
To the approved drawings, with temporary propping where needed.—
Completion
Authority and developer
Inspection and completion of the works.Wall opening sign-off

How it works

How it works

1. Send photos

The wall, the ceiling and what you want.

2. Records

As-built drawings, or a survey.

3. Structural check

Load-bearing or not, and what is above.

4. Design

Beam or lintel, stamped calculations.

5. NOC and permit

Developer, landlord or BM, then the authority.

6. Works and completion

Propping, works, inspection.

Planning a wall change?

Check the wall first

Send us three things on WhatsApp:

  1. Photos of the wall and the ceiling above
  2. Your community or building, and unit number
  3. What you want to open or remove

Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.

Questions

Questions

Is a standard lintel enough?

Not always. It depends on the load above and the span.

How long should the bearing be?

The design sets it for each end.

Steel, concrete or precast?

All are used; we choose for the wall and the works.

New window in an external wall?

The developer NOC also covers the façade change.

Does a lintel need calculations?

In load-bearing walls, yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.