The Lakes Structural Calculations for Villa Works
The Lakes structural calculations are needed for extensions, wall or column removal, openings, pools and pergolas. We prepare them for the Emaar NOC and the Dubai Municipality permit, and we review calculations prepared by contractors.
The short answer
Structural works in a villa in The Lakes, such as an extension, removing a wall or column, a new opening, a pool or a pergola, need stamped structural calculations. They go with the Emaar NOC application and the Dubai Municipality permit, since The Lakes is part of Emirates Living. We prepare the calculations from the Emaar as-built plans and a site check, and we can also review calculations already prepared by your contractor.

What we check first
- Existing structure: slabs, beams, columns and foundations, from the Emaar as-built plans and on site.
- New loads: extensions, new rooms and openings that add or move load.
- Existing calculations: any design already prepared by a contractor.
- Unapproved works: older changes that need approval before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in The Lakes
- Title deed and owner ID
- Any existing drawings or contractor calculations
- The layout you want
Who does what
The approval route in The Lakes
The Lakes is part of Emirates Living: Emaar first, then Dubai Municipality.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides. | As-built drawings, The Lakes |
| Emaar NOC Emaar Community Management | NOC through the Emaar Community Portal; Emaar reviews the design and confirms its fees. | Emaar extension fees |
| Permit Dubai Municipality | Building permit for structural works, submitted by an approved consultant. | The Lakes building permit |
| Inspections Emaar and Dubai Municipality | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Municipality | Completion certificate that closes the permit; Emaar then closes its file. | Lakes extension sign-off |
How it works
How it goes
Site check and plans
We check the villa on site and work from the as-built plans Emaar provides.
Calculations and drawings
Stamped calculations and structural drawings for the works.
Emaar, then Dubai Municipality
Emaar NOC, then the Dubai Municipality permit, inspections and completion.
Guides for works in The Lakes
What each work needs in The Lakes
- Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
- Wall or column removal: structural design, Emaar NOC and Dubai Municipality permit
- Change during construction: revised drawings approved before works continue
- Pergola or steel shade: stamped calculations and an approved steel contractor or specialist stamp
- Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
Questions
Structural calculation questions in The Lakes
When do I need structural calculations in The Lakes?
For any work that changes the structure or adds load: extensions, wall or column removal, new openings, pools, pergolas and roof additions.
Who approves structural works in The Lakes?
Emaar issues the NOC through the Emaar Community Portal, then Dubai Municipality issues the permit. The Lakes is part of Emirates Living.
Can you review my contractor’s calculations?
Yes. We review the calculations and drawings, check the works on site and give you a clear conclusion, with an alternative design if needed.
Can I remove a column in my Lakes villa?
Often, with an alternative structural design that carries the loads, an Emaar NOC and a Dubai Municipality permit. See our Lakes villa case study for a real example.
Will a first-floor extension need strengthening below?
Sometimes. The columns, beams and foundations below are checked against the new loads at design stage.
Do you need the original drawings?
Emaar provides as-built plans for Lakes villas. Where something is missing, we survey on site.
Does a steel pergola need structural calculations?
Yes, with stamped calculations and an approved steel contractor or specialist stamp, plus the Emaar NOC.
Last checked: October 2026. Official sources: Emaar · Dubai Municipality