The Lakes As-Built Drawings: Original Plans or Site Survey
The Lakes as-built drawings: Emaar provides as-built plans to owners. Where plans are missing or out of date, we survey the villa and redraw them in PDF and CAD.
As-built drawings show the villa as it is built: layouts, dimensions, structure and any changes. You need them for extensions, approvals, sales and fixing unapproved works. Emaar provides as-built plans to owners. Where they are missing, incomplete or don’t match the villa, we survey on site and prepare new as-built drawings in PDF and CAD.


What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing floor area: measured from the as-built plans, so the extension allowance is right.
- Unapproved works: older changes are surveyed and approved before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in The Lakes
- Title deed and owner ID
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Who does what
The approval route in The Lakes
The Lakes is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides. | — |
| Emaar NOC Emaar Community Management | NOC. Emaar reviews the design and confirms its fees. | Emaar extension fees |
| Permit Dubai Municipality | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Emaar and Dubai Municipality | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Municipality | Completion certificate that closes the permit; Emaar then closes its file. | — |
How it works
How it works in The Lakes
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Emaar as-built plans, a site check, drawings and stamped calculations where needed.
We get it approved
Emaar NOC, then the Dubai Municipality permit where the works are structural.
Guides for works in The Lakes
- Villa modification guide
- Villa extension NOC
- Can I extend my villa?
- How much bigger can my villa be?
- Open up walls (living, dining, kitchen)
- Close my balcony
- Pergola or car shade
- Swimming pool
- Garage conversion
- Maid room
- Add a bedroom
- Villa lift
- Solar panels
- Structural calculations
- Case: column removed, then rebuilt
- Selling with unapproved changes
What each work needs in The Lakes
- Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
- Wall removal: structural check, Emaar NOC and Dubai Municipality permit
- Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
- Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
- External colour or façade: Emaar NOC
- Internal finishes only: usually no permit; check with Emaar first

Questions
Questions owners ask in The Lakes
Where do I get the original plans?
Emaar provides as-built plans to owners.
What if the plans don’t match my villa?
We survey the villa and redraw the as-built drawings to match.
What formats do you provide?
PDF and CAD.
Why do I need as-built drawings?
For extension designs, approvals, a sale, and fixing earlier unapproved works.
Do you visit the villa?
Yes, for a survey where drawings are missing or out of date.
Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA
Related guides
Keep reading
Related
