Signage Structural Calculations in Dubai
Signage structural calculations check the wind load, the sign's own weight, the steel or aluminium frame, the fixings and the wall, slab, parapet or foundation that carries the sign. Our engineers prepare and stamp them for shop signs, rooftop signs, pylons, totems, billboards and LED screens, for the landlord, the mall and the authority submission. The wind load and design follow the Dubai Building Code.
Larger, rooftop, freestanding, projecting and heavy signs usually need stamped structural calculations. Small flat signs fixed to a solid wall may not; we confirm what your approval needs. Billboards need a Dubai Municipality advertisement permit, plus RTA approval at the roadside.
Sign types
Structural calculations by sign type
Our engineers confirm what your sign needs before design.
| Sign type | Main checks | Guide |
|---|---|---|
| Billboard | Wind load, frame or unipole, anchors, foundation | Billboard calculations |
| Unipole | Column, base plate, anchor bolts, foundation | Unipole calculations |
| LED screen | Screen weight, frame, fixings | LED screen calculations |
| Rooftop sign | Frame and the roof slab load | Roof slab check |
| Parapet sign | Fixings and the parapet | Parapet check |
| Facade or cladding sign | Fixings through the cladding | Fixing to cladding |
| Wall sign | Fixings into concrete or block | Fixing to walls |
| Pylon or totem | Frame, base plate, foundation | Signage foundation design |
What we calculate
What signage calculations cover
| Item | What we check |
|---|---|
| Wind load | On the sign face, as per the Dubai Building Code |
| Self-weight | Sign, frame, lighting and screens |
| Steel or aluminium frame | Members and connections; see aluminium frame design |
| Connections | Welds and bolts; see connection design |
| Base plate and anchor bolts | See base plate and anchor bolt design |
| Supporting structure | Wall, slab, parapet, cladding or foundation |
Who asks for them
Who needs signage calculations?
| Who | Why |
|---|---|
| Shop and business owners | For the landlord or mall NOC and the signage permit for the area |
| Sign makers and signage companies | We prepare and stamp the calculations for their clients' submissions |
| Billboard owners | For the Dubai Municipality advertisement permit, plus RTA at the roadside |
| Landlords, malls and building managers | To check the sign is safe on their building |
Official sites: Dubai Municipality | RTA
What you need to know
- Stamped: calculations for the authority submission are stamped by the engineer.
- Dubai code: wind load and design as per the Dubai Building Code.
- Landlord first: shop and building signs need the landlord, building or mall NOC.
- Supporting structure: the wall, slab or parapet is checked too.
Documents you will need
- Sign drawings with size and weight
- Location and photos of where it will be fixed
- Building drawings, if available
- Trade licence and landlord or mall NOC, for shop signs
How it works
How we prepare signage calculations
1. Send us the details
Sign drawings, size, location and photos.
2. Supporting structure
We check the wall, slab, parapet or foundation.
3. Loads
Wind load as per the Dubai Building Code and self-weight.
4. Design
Frame, connections and anchors.
5. Stamped report
Calculations and drawings stamped for the submission.
6. Comments
We answer the comments on the structure.
Existing signs
Already installed, damaged or not approved?
Our engineers can inspect an existing sign and prepare stamped calculations. Built works take an as-built route; a fine may apply, depending on the case. See unsafe signage structure assessment.
Contact us and we will help you accordingly. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Signage calculation questions
Does my sign need structural calculations?
Larger, rooftop, freestanding, projecting and heavy signs usually do. Small flat signs fixed to a solid wall may not. We confirm what your approval needs.
Do the calculations need a stamp?
Yes. Calculations for the authority submission are stamped by the engineer. Our engineers stamp the report.
Which code is used for signage wind load?
The Dubai Building Code, for the height, size and location of the sign.
Who approves billboards in Dubai?
Dubai Municipality issues the advertisement permit. At the roadside, RTA approval is needed as well.
Do you work with sign makers?
Yes. Sign makers and signage companies send us the sign design and site details, and we prepare and stamp the calculations for their client's submission.
Is the wall or roof checked too?
Yes. The wall, slab, parapet, cladding or foundation that carries the sign is part of the calculations.
Can you design steel sign structures?
Yes. Our engineers design the steel frame, connections, base plates and anchor bolts.
What if a sign was installed without approval?
Built works take an as-built route, and a fine may apply, depending on the case. Contact us and we will help you accordingly.
Who can prepare signage calculations in Dubai?
Structural Solutions prepares stamped signage structural calculations for landlords, malls and authorities. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
