Signage Load on Roof Slab Assessment Dubai

Rooftop signs load the roof slab and beams. We assess whether the existing roof can carry the sign or needs strengthening.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What We Check

Wind load, the sign’s self-weight, the frame members, connections and anchors, and the structure the sign is fixed to — wall, cladding, parapet, roof slab or foundation.

Our Calculation Process

01

Sign Drawings & Site Information Reviewed

02

Supporting Structure Checked

03

Loads Calculated (Wind & Self-Weight)

04

Frame, Connections & Anchors Designed

05

Calculations Stamped by Engineer

06

Submitted With the Sign Approval

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What You Receive

The result is an engineer-stamped calculation and detail ready for submission with the sign approval.

Projects We Handle

Rooftop Sign

Facade Sign

Pylon

Billboard

LED Screen

Existing Sign Check

Signage Load on Roof Slab Assessment Dubai at a Glance

StepWhoWhat happens
1Structural engineerPrepares the sign drawings and, for larger signs, the stamped structural calculations.
2Landlord, mall or master developerIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, mall or developer NOC
  • Sign design with size, materials and position
  • Photos of the facade or location

Key Technical Rules

  • NOC first: the landlord, mall or developer approves the sign before the authority permit.
  • Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
  • Size and position rules: set by the building and the authority for the area.
  • Electrical safety: illuminated signs need safe electrical details.
  • Permit before installation: signs go up only after approval.
Structural calculations for Dubai approvals — Structural Solutions

Landlord NOC

First approval

Wind & Fixings

Stamped calculations

Signage Permit

Before installation

Why Businesses and Sign Companies Choose Structural Solutions

Structural Engineering In-House

Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.

Engineer-Stamped Drawings

Drawings and calculations stamped for landlords, malls, developers and authorities.

Full Approval Route

From the landlord, mall or developer NOC through to the authority signage permit.

Get Your Signage Approved

Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.

Signage Load on Roof Slab Assessment Dubai — FAQs

Who stamps signage structural calculations?

A registered engineering consultant.

Do you work with sign companies?

Yes — we prepare calculations and drawings for sign makers and fit-out companies.

Can I install the sign before approval?

No — install only after the landlord or mall approval and the signage permit are issued.

Do you prepare the sign drawings?

Yes — elevations, materials and fixing details, stamped where required.

Can you work with my sign company?

Yes — we provide structural calculations, stamped drawings and approval support for sign makers.