Clear shop drawings, matched to the structural calculations, are what get signs approved without comments.
Signage Shop Drawings for Approval Dubai
Signage shop drawings show exactly how a sign will be built and fixed — dimensions, materials, frame, connections and anchors. We prepare and stamp them for landlord, mall and authority approval.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
What We Check
Wind load, the sign’s self-weight, the frame members, connections and anchors, and the structure the sign is fixed to — wall, cladding, parapet, roof slab or foundation.
Our Calculation Process
01
Sign Drawings & Site Information Reviewed
02
Supporting Structure Checked
03
Loads Calculated (Wind & Self-Weight)
04
Frame, Connections & Anchors Designed
05
Calculations Stamped by Engineer
06
Submitted With the Sign Approval
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
What You Receive
Projects We Handle
Facade Sign
Pylon
3D Letters
Projecting Sign
LED Screen
Rooftop Sign
Signage Shop Drawings for Approval Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Prepares the sign drawings and, for larger signs, the stamped structural calculations. |
| 2 | Landlord, mall or master developer | Issues the NOC for the works. |
| 3 | Authority — Dubai Municipality, DDA or Trakhees — depending on the community | Reviews the drawings and issues the permit. |
| 4 | Landlord and authority | Completion inspection. |
Documents Required
- Trade licence
- Tenancy contract or Ejari
- Landlord, mall or developer NOC
- Sign design with size, materials and position
- Photos of the facade or location
Key Technical Rules
- NOC first: the landlord, mall or developer approves the sign before the authority permit.
- Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
- Size and position rules: set by the building and the authority for the area.
- Electrical safety: illuminated signs need safe electrical details.
- Permit before installation: signs go up only after approval.
Landlord NOC
First approval
Wind & Fixings
Stamped calculations
Signage Permit
Before installation
Why Businesses and Sign Companies Choose Structural Solutions
Structural Engineering In-House
Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.
Engineer-Stamped Drawings
Drawings and calculations stamped for landlords, malls, developers and authorities.
Full Approval Route
From the landlord, mall or developer NOC through to the authority signage permit.
Get Your Signage Approved
Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.
Signage Shop Drawings for Approval Dubai — FAQs
Who stamps signage structural calculations?
A registered engineering consultant.
Do you work with sign companies?
Yes — we prepare calculations and drawings for sign makers and fit-out companies.
Can I install the sign before approval?
No — install only after the landlord or mall approval and the signage permit are issued.
Do you prepare the sign drawings?
Yes — elevations, materials and fixing details, stamped where required.
Can you work with my sign company?
Yes — we provide structural calculations, stamped drawings and approval support for sign makers.