Signage Structural Calculations Dubai

We prepare engineer-stamped structural calculations for signs in Dubai — rooftop, pylon, totem, billboard, facade, projecting and LED screen signs — covering wind load, self-weight, the sign frame, fixings and the supporting structure, ready for landlord, mall and authority approval.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What Signage Calculations Cover

Wind load on the sign face, the sign’s own weight, the steel or aluminium frame, the connections and anchors, and whether the wall, slab, parapet, cladding or foundation it is fixed to can carry the loads.

How We Get Your Signage Approved

01

Sign Design, Size & Location Reviewed

02

Landlord, Mall or Developer NOC

03

Structural Check Where Needed

04

Engineer-Stamped Drawings & Calculations

05

Authority Signage Permit

06

Installation & Inspection

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Projects We Handle

Rooftop Sign

Pylon Sign

Billboard

Facade Sign

LED Screen

Projecting Sign

Signage Structural Calculations Dubai at a Glance

StepWhoWhat happens
1Structural engineerPrepares the sign drawings and, for larger signs, the stamped structural calculations.
2Landlord, mall or master developerIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, mall or developer NOC
  • Sign design with size, materials and position
  • Photos of the facade or location

Key Technical Rules

  • NOC first: the landlord, mall or developer approves the sign before the authority permit.
  • Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
  • Size and position rules: set by the building and the authority for the area.
  • Electrical safety: illuminated signs need safe electrical details.
  • Permit before installation: signs go up only after approval.
Structural calculations for Dubai approvals — Structural Solutions

Landlord NOC

First approval

Wind & Fixings

Stamped calculations

Signage Permit

Before installation

Why Businesses and Sign Companies Choose Structural Solutions

Structural Engineering In-House

Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.

Engineer-Stamped Drawings

Drawings and calculations stamped for landlords, malls, developers and authorities.

Full Approval Route

From the landlord, mall or developer NOC through to the authority signage permit.

Get Your Signage Approved

Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.

Signage Structural Calculations Dubai — FAQs

What do signage structural calculations include?

Wind load, self-weight, frame design, connections, anchors and the supporting structure.

Who stamps them?

A registered engineering consultant.

Can I install the sign before approval?

No — install only after the landlord or mall approval and the signage permit are issued.

Do you prepare the sign drawings?

Yes — elevations, materials and fixing details, stamped where required.

Can you work with my sign company?

Yes — we provide structural calculations, stamped drawings and approval support for sign makers.