Shops Merged Without Approval in Dubai
The wall is already gone. Here is how a merge done without approval is put right.
The merge needs to go through the as-built route. We survey the units, check the structure where the wall was removed, prepare the as-built drawings and the fire safety, and submit with the owner and building NOC. A fine may apply, depending on the case. Contact us and we help you accordingly.

Official sources: Dubai Municipality · DDA · Dubai Civil Defence · DEWA · Dubai Land Department
What decides it
- Survey: What was done
- Structure: Where the wall was removed
- Fire safety: For the merged unit
- NOC: Owner and building
Documents you will need
- Title deeds, or the tenancy contracts with the owner's written NOC
- Unit numbers and building name
- Existing drawings of both units, if available
- Photos of the wall between the units
Route
The shop merging route
The general route. We confirm it for your building and area.
| Step | Approval route | Guides |
|---|---|---|
| NOC Owner or landlord, and building management | Approval of the merge by the owner or landlord and the building management or developer. | Combination NOC |
| Structural check Consultant | We check the wall between the units and design the opening. | Party wall assessment |
| Authority approval The authority for the area | We submit the merging drawings as your consultant. | — |
| Civil Defence (DCD) DCD | Fire and life safety for the merged layout: exits, alarms, sprinklers. | DCD for merged shops |
| Utilities DEWA | Meters and load for the merged unit, where needed. | DEWA meters |
| Completion Authority and DCD | Inspection and completion. The title deeds can then be updated at DLD where the owner wants it. | Title deed |
How it works
How we take your merge to completion
1. Send us the details
Area, building, both unit numbers and photos.
2. We confirm the route
NOC, authority and DCD for your building.
3. Structural check
The wall between the units.
4. Drawings
Merged layout, structure, fire safety, MEP.
5. Approvals
We submit and follow up.
6. Works and completion
By your contractor, then inspection.
Related guides
- shop-merging-approval-dubai
- Party wall is load-bearing
What stops a merge
- Waiting for an inspection
- Adding more works
- No structural check
Merging two units?
Get your route confirmed
Send us three things on WhatsApp:
- The area, building and both unit numbers
- Photos of the wall between the units
- Shop, office or restaurant
We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.
Questions
Questions
Is there a fine?
A fine may apply, depending on the case.
Can it be approved?
In many cases, with changes where needed.
What do you need?
Photos, the unit numbers and any notice.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.