العربيةShared Housing · Questions

What documents do I need for a shared accommodation permit?

Shared accommodation permit documents: title deed or tenancy contract with owner NOC, ID, the affection plan, layout drawings and photos. We prepare the drawings.

The short answer

For the shared accommodation permit and DCD approval, we need: the title deed (owner) or the tenancy contract with the owner NOC (tenant); Emirates ID or passport; the affection plan or site plan; any existing drawings; photos of the rooms and facilities; and a trade licence if a company owns or operates the property. We survey the property and prepare the layout and fire safety drawings to the DM rules (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026).

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Shared accommodation permit documents: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about shared accommodation permit documents

Do I need old drawings?

They help; we can survey.

Is a building management NOC needed?

The owner NOC is enough.

Do companies need a trade licence?

Yes.

How do I send them?

By WhatsApp or our request form.

Related guides

Keep reading