Shared Housing · Questions

How do I regularise shared accommodation in Dubai?

To regularise shared accommodation: check the area, correct the layout and occupancy, then get DCD approval and the DM permit before 8 September 2027.

The short answer

To regularise existing shared accommodation (Dubai Municipality circular, reported by Khaleej Times on 8 October 2026): confirm the area is allowed and the category (individual or family; family only on the four main roads); survey the property; correct rooms to 5 m² per person and add missing facilities; check partitions structurally; then apply for Civil Defence approval and the shared accommodation permit. We handle the drawings and approvals.

Allowed areas28 fully, 11 partly
Room size5 m² per person
Deadline8 September 2027

Regularise shared accommodation: what you need to know

  • Allowed areas only: 28 fully and 11 partly allowed areas.
  • 5 m² per person: Minimum bedroom area.
  • One category: Individual or family, not mixed.
  • DCD and DM: Both approvals are required.

What to send us

  • Title deed (owner), or tenancy contract with owner NOC (tenant)
  • Emirates ID or passport
  • Affection plan or site plan
  • Existing drawings, if available; we can survey
  • Photos of the rooms and facilities
  • Trade licence, if a company owns or operates the property

Who does what

From check to permit

The order of the DCD and DM steps can vary; we confirm it for your property.

StepApproval routeGuides
Check the area and category
You and us
Confirm the property is in an allowed area, and choose individual or family housing.Allowed areas
Owner NOC (tenants)
Owner
A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed.Tenants
Survey and layout drawings
Structural Solutions
Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry.Layout drawings
Structural check
Structural Solutions
Partitions and any added loads are checked by our engineers.—
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval for the shared accommodation.DCD approval
Shared accommodation permit
Structural Solutions → Dubai Municipality
The permit to operate the property as shared accommodation.The permit

How it works

How it works

1. Check

Area, category and occupancy for your property.

2. Drawings

Survey and layout drawings to the DM rules.

3. Approvals

DCD approval and the DM shared accommodation permit.

4. Operate

Rent the property as permitted shared accommodation.

Questions

More questions about regularise shared accommodation

Is there a deadline?

8 September 2027.

Can unapproved partitions stay?

Only if they fit the approved layout.

Do I need DCD?

Yes.

Can a tenant regularise?

With the owner NOC.

Related guides

Keep reading