My Murooj Al Furjan Renovation Was Stopped: What Now?
My Murooj Al Furjan Renovation Was Stopped: What Now? Works usually stop because an approval is missing or the works differ from the approved drawings. The fix is the right approval, then a restart.
The short answer
Renovations in Murooj Al Furjan are stopped by Nakheel or Trakhees inspectors when works start without the NOC or permit, or when they differ from the approved drawings. To restart, apply for the missing approval or revised drawings and fix any issues found. We survey the works, prepare the drawings and calculations, and handle the approvals.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing area: measured from the Nakheel villa plans and on site.
- Unapproved works: older changes that would show in the Nakheel VSR are approved first.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in Murooj Al Furjan
- Title deed and owner ID
- A sketch or short description of the idea
- Nakheel villa plans, if you have them
Who does what
The approval route in Murooj Al Furjan
Nakheel first, then Trakhees. Murooj Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides. | — |
| Nakheel NOC Nakheel | NOC through the Nakheel online portal. Nakheel reviews the design and confirms its fees. | Nakheel extension fees |
| Permit Trakhees | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Nakheel and Trakhees | Inspections during and after the works. | — |
| Completion Trakhees | Completion certificate that closes the permit; Nakheel updates its records. | — |
How it works
How it works in Murooj Al Furjan
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Nakheel villa plans, a site check, drawings and stamped calculations where needed.
We get it approved
Nakheel NOC through the Nakheel online portal, then the Trakhees permit where the works are structural.
Guides for works in Murooj Al Furjan
- What can I change? (start here)
- Can I extend my villa?
- How much bigger can my villa be?
- Add a bedroom
- Room on the roof
- Open up walls inside
- Close my balcony
- Garage conversion
- Maid room in the garden
- Pergola or car shade
- Swimming pool
- Villa lift
- Solar panels
- Previous owner’s extension
- Selling with unapproved changes
What each work needs in Murooj Al Furjan
- Extension: Nakheel NOC, Trakhees permit and stamped calculations
- Wall removal: structural check, Nakheel NOC and Trakhees permit
- Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
- Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
- External colour or façade: Nakheel NOC
- Internal finishes only: usually no permit; check with Nakheel first
Questions
Questions owners ask in Murooj Al Furjan
Why was my renovation stopped?
Usually a missing NOC or permit, or works that differ from the approved drawings.
Who stops the works?
Nakheel community inspectors or Trakhees inspectors.
How do I restart?
Apply for the missing NOC or permit, or revised drawings, and fix any issues.
Can there be penalties?
Nakheel or Trakhees can apply penalties for unapproved works. Getting the works approved quickly is the priority.
Can you take over the approvals?
Yes. We survey the works and handle the approvals.
Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality