Can I Open Up Walls Inside My Murooj Al Furjan Villa?

Can I Open Up Walls Inside My Murooj Al Furjan Villa? Often, yes, including the wall between living and dining or the kitchen, after a structural check. Load-bearing walls need a new beam, a Nakheel NOC and a Trakhees permit.

The short answer

Many owners want an open-plan living, dining and kitchen area. Some internal walls are partitions and can be removed with a Nakheel NOC; others carry the floor or roof above and need a beam designed by an engineer, stamped calculations and a Trakhees permit. We check which walls are load-bearing from the as-built plans and on site before anything is removed. If a column is in the way, it can sometimes be removed too, with an alternative structural design.

Developer NOCNakheel NOC
AuthorityTrakhees
PlansNakheel provides villa plans
open up walls inside my Murooj Al Furjan villa

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing area: measured from the Nakheel villa plans and on site.
  • Unapproved works: older changes that would show in the Nakheel VSR are approved first.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Murooj Al Furjan
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Nakheel villa plans, if you have them

Who does what

The approval route in Murooj Al Furjan

Nakheel first, then Trakhees. Murooj Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides.—
Nakheel NOC
Nakheel
NOC. Nakheel reviews the design and confirms its fees.Nakheel extension fees
Permit
Trakhees
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Nakheel and Trakhees
Inspections during and after the works.—
Completion
Trakhees
Completion certificate that closes the permit; Nakheel updates its records.—

How it works

How it works in Murooj Al Furjan

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Nakheel villa plans, a site check, drawings and stamped calculations where needed.

We get it approved

Nakheel NOC, then the Trakhees permit where the works are structural.

What each work needs in Murooj Al Furjan

  • Extension: Nakheel NOC, Trakhees permit and stamped calculations
  • Wall removal: structural check, Nakheel NOC and Trakhees permit
  • Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
  • Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
  • External colour or façade: Nakheel NOC
  • Internal finishes only: usually no permit; check with Nakheel first

Questions

Questions owners ask in Murooj Al Furjan

Can I remove the wall between living and dining?

Often, yes. If it is load-bearing, a new beam carries the load, designed with stamped calculations.

How do I know if a wall is load-bearing?

From the as-built plans and a site check by an engineer. Don’t rely on knocking on the wall or guessing.

Can I open the kitchen to the living area?

Often, yes, with the same check and approvals.

What size beam do I need?

It depends on the span and the loads. An engineer calculates it; there is no standard size.

Can I remove a column too?

Sometimes, with an alternative structural design that carries the loads, plus the approvals. We study the structure first.

What approvals are needed?

A Nakheel NOC, and a Trakhees permit where structural walls change.

Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality