Murooj Al Furjan · Nakheel · Villa

Is the Previous Owner’s Extension Approved in Murooj Al Furjan?

Is the Previous Owner’s Extension Approved in Murooj Al Furjan? Check before you buy or renovate. Unapproved works must be approved or removed before new works or a sale.

The short answer

Many villas in Murooj Al Furjan have extensions or changes from earlier owners. To know whether they are approved, compare the villa with the approved drawings and the Nakheel and Trakhees records. Unapproved changes show up in the Nakheel Villa Status Report (VSR) and need fixing before a sale. If something is not approved, we survey it, prepare drawings and calculations and apply for approval, or advise removal.

Developer NOCNakheel online portal
AuthorityTrakhees
PlansNakheel provides villa plans
previous owner’s extension approved in Murooj Al Furjan

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing area: measured from the Nakheel villa plans and on site.
  • Unapproved works: older changes that would show in the Nakheel VSR are approved first.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Murooj Al Furjan
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Nakheel villa plans, if you have them

Who does what

The approval route in Murooj Al Furjan

Nakheel first, then Trakhees. Murooj Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides.—
Nakheel NOC
Nakheel
NOC through the Nakheel online portal. Nakheel reviews the design and confirms its fees.Nakheel extension fees
Permit
Trakhees
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Nakheel and Trakhees
Inspections during and after the works.—
Completion
Trakhees
Completion certificate that closes the permit; Nakheel updates its records.—

How it works

How it works in Murooj Al Furjan

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Nakheel villa plans, a site check, drawings and stamped calculations where needed.

We get it approved

Nakheel NOC through the Nakheel online portal, then the Trakhees permit where the works are structural.

What each work needs in Murooj Al Furjan

  • Extension: Nakheel NOC, Trakhees permit and stamped calculations
  • Wall removal: structural check, Nakheel NOC and Trakhees permit
  • Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
  • Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
  • External colour or façade: Nakheel NOC
  • Internal finishes only: usually no permit; check with Nakheel first

Questions

Questions owners ask in Murooj Al Furjan

Is the Previous Owner’s Extension Approved in Murooj Al Furjan?

Compare the villa with the approved drawings and records. We check it on site.

What if it is not approved?

It needs a retrospective approval with drawings and calculations, or removal.

Can I start new works before fixing it?

Usually not. Earlier works are approved first.

Does it affect a sale?

Unapproved changes show up in the Nakheel Villa Status Report (VSR) and need fixing before a sale.

Does it use the extension allowance?

An approved earlier extension uses part of it.

Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality

Related guides

Keep reading