Can I Close My Balcony in Murooj Al Furjan?
Can I Close My Balcony in Murooj Al Furjan? Often, yes, with a Nakheel NOC and a Trakhees permit. A closed balcony becomes floor area, so it counts toward the extension allowance.
The short answer
Closing a balcony with glass or walls turns it into enclosed floor area. Nakheel reviews how it looks from outside and counts the area toward the extension allowance. It needs a Nakheel NOC, a Trakhees permit and a check of the balcony slab for the new walls or glazing. Nakheel reviews each extension against the villa, the plot and the community requirements. There is no fixed percentage we can confirm for every villa, so we check your villa and plot before designing.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing area: measured from the Nakheel villa plans and on site.
- Unapproved works: older changes that would show in the Nakheel VSR are approved first.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in Murooj Al Furjan
- Title deed and owner ID
- A sketch or short description of the idea
- Nakheel villa plans, if you have them
Who does what
The approval route in Murooj Al Furjan
Nakheel first, then Trakhees. Murooj Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides. | — |
| Nakheel NOC Nakheel | NOC through the Nakheel online portal. Nakheel reviews the design and confirms its fees. | Nakheel extension fees |
| Permit Trakhees | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Nakheel and Trakhees | Inspections during and after the works. | — |
| Completion Trakhees | Completion certificate that closes the permit; Nakheel updates its records. | — |
How it works
How it works in Murooj Al Furjan
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Nakheel villa plans, a site check, drawings and stamped calculations where needed.
We get it approved
Nakheel NOC through the Nakheel online portal, then the Trakhees permit where the works are structural.
Guides for works in Murooj Al Furjan
- What can I change? (start here)
- Can I extend my villa?
- How much bigger can my villa be?
- Add a bedroom
- Room on the roof
- Open up walls inside
- Close my balcony
- Garage conversion
- Maid room in the garden
- Pergola or car shade
- Swimming pool
- Villa lift
- Solar panels
- Previous owner’s extension
- Selling with unapproved changes
What each work needs in Murooj Al Furjan
- Extension: Nakheel NOC, Trakhees permit and stamped calculations
- Wall removal: structural check, Nakheel NOC and Trakhees permit
- Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
- Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
- External colour or façade: Nakheel NOC
- Internal finishes only: usually no permit; check with Nakheel first
Questions
Questions owners ask in Murooj Al Furjan
Can I Close My Balcony in Murooj Al Furjan?
Often, yes, with a Nakheel NOC and a Trakhees permit, if the design suits the villa’s look.
Does a closed balcony count as an extension?
Yes. It becomes enclosed floor area and counts toward the allowance and the fees.
Can I use glass instead of walls?
Often glazing is easier to accept. It still adds enclosed area and needs the NOC.
Does the balcony slab need checking?
Yes, for the weight of new walls or glazing, with stamped calculations.
What approvals are needed?
A Nakheel NOC through the Nakheel online portal, and a Trakhees permit where the works are structural or add floor area.
Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality
Related guides
