JLT As-Built Drawings: Where to Get Them and Who Prepares Them
You need drawings of your JLT unit before a fit-out, for the COC and often when you leave. Here is where they come from.
The short answer
Existing drawings of a JLT unit come from building management or DMCC. If the unit has been changed since, or no drawings exist, we survey it and prepare as-built drawings that match what is built. At the end of a fit-out, the as-built drawings show the works as finished and go with the COC submission to Concordia.
What you need to know
- Before a fit-out: The existing layout is the base for the fit-out drawings.
- After a fit-out: As-built drawings show the finished works for the COC.
- When leaving: The landlord or building management may ask for drawings of the unit as handed back.
- No drawings?: We survey the unit and draw it as built, in PDF and CAD.
Documents you will need
- Trade licence and lease, or title deed for owners
- Building management or owners association NOC
- Existing or as-built drawings of the unit
- Fit-out drawings, with stamped structural calculations where structure is affected
- Fire safety drawings where Civil Defence is involved
By situation
When you need as-built drawings
We confirm the route for your tower and unit.
| Situation | Approval route | Guides |
|---|---|---|
| Starting a fit-out Existing drawings | Base for the design. | No drawings? |
| Finishing a fit-out As-built drawings | For the Concordia COC. | As-built for the COC |
| End of lease As handed back | If asked by the landlord. | End of lease |
| Works done earlier Survey and as-built | Before approval after the works. | Works already done |
How it works
How we get your JLT approval
1. Unit review
Tower, unit, current layout and the works planned.
2. Existing drawings
From building management or DMCC. If the unit was changed, we survey it and update the as-built drawings.
3. Drawings and calculations
Fit-out drawings, fire safety drawings and stamped structural calculations where needed.
4. Building NOC
Building management or owners association NOC for the works.
5. DMCC via Concordia, then DCD
Concordia reviews the drawings for the DMCC approval; Civil Defence approves fire safety.
6. Inspection and COC
Concordia inspects the finished works and issues the Certificate of Completion.
Who does what
Who approves works in JLT
DMCC and Concordia
DMCC approves the fit-out. Concordia, appointed by DMCC, reviews the drawings, inspects the works and issues the COC.
Concordia vs DMCC →Dubai Civil Defence
Approves and inspects fire safety changes such as sprinklers, fire alarm and exits.
DCD in JLT →What we prepare
- Site survey of the unit
- As-built drawings in PDF and CAD
- Fit-out drawings for Concordia
Why Concordia sends drawings back
- Building management NOC missing
- Drawings that do not match the unit as it stands
- Fire safety changes without DCD approval
- Structural changes without stamped calculations
- Works started before approval
- Contractor not registered with Concordia
Questions
Questions tenants and owners ask
Where do I get drawings of my JLT unit?
From building management or DMCC.
Who prepares as-built drawings?
An engineering consultant surveys the unit and draws it as built; we do this in PDF and CAD.
How are as-built drawings submitted to Concordia?
With the COC documents at the end of the fit-out.
Do I need them when I leave my office?
If the landlord or building management asks for drawings of the unit as handed back.