Do I Need Civil Defence (DCD) Approval for a JLT Fit-Out?
Yes. JLT fit-outs need Civil Defence approval for the fire safety, after the building NOC and the DMCC approval through Concordia.
The short answer
Yes. A fit-out in JLT goes through the building management NOC, the DMCC approval reviewed through Concordia, and Dubai Civil Defence (DCD) approval for the fire safety. Changes to the ceiling, sprinklers, smoke detectors, alarm, emergency lighting or exits are shown on the fire safety drawings. If DCD sends comments or rejects the drawings, they are revised and resubmitted before the works continue.
What you need to know
- Ceilings: A new ceiling changes the sprinkler and detector layout.
- Sprinklers: Moved or added heads are shown on the drawings.
- Exits: Partitions must keep the escape routes.
- DCD comments: Answered on revised drawings and resubmitted.
- Rejected?: The drawings are corrected; works wait for the approval.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or owners association NOC
- Existing or as-built drawings of the unit
- Proposed fit-out drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Contractor registration with Concordia
By type of unit
Approvals by type of unit
We confirm the route for your unit.
| Unit | Approval route | Guides |
|---|---|---|
| Office Building NOC, DMCC via Concordia, DCD | Layout, MEP and fire safety. | DMCC fit-out |
| Shop Building NOC, DMCC via Concordia, DCD | Shopfront and signage too. | Shops |
| Restaurant or café Plus DM Food Safety | Kitchen layout. | Restaurants |
| Clinic Plus DHA | Health facility approval. | Clinics |
| Apartment Building or OA NOC, DMCC via Concordia | Renovation works. | Apartments |
How it works
How we get your JLT approval
1. Review
The unit, the changes and the drawings you have.
2. Drawings
Existing drawings from building management or DMCC, or we survey and redraw.
3. Building NOC
From building management or the owners association.
4. DMCC and Concordia
Fit-out approval, reviewed through Concordia.
5. Civil Defence
Fire safety drawings approved.
6. Works
By a contractor registered with Concordia.
7. COC
Concordia inspection and Certificate of Completion.
Who does what
Who approves it in JLT
Building management
The building management or owners association NOC comes first.
Building NOC first →DMCC through Concordia
DMCC approves the fit-out; Concordia reviews the drawings, inspects the works and issues the COC.
Concordia and DMCC →Structural Solutions
Prepares the drawings and calculations and handles the submissions.
Talk to our engineers →What we prepare
- Fire safety drawings
- DCD submission and comments
Why JLT submissions get returned
- Drawings that do not match the unit
- Building management NOC missing
- Fire safety changes without DCD approval
- Contractor not registered with Concordia
- Works started before approval
Questions
Questions tenants and owners ask
Does a JLT fit-out need DCD approval?
Yes.
Do I need DCD approval to change my ceiling or sprinklers?
Yes, they are part of the fire safety drawings.
What if DCD rejects my fit-out?
The drawings are corrected and resubmitted before the works continue.
Is DCD before or after DMCC?
After the building NOC and the DMCC approval through Concordia.