JLT Apartment Renovation NOC: What You Can Change and How to Get Approval
Renovating an apartment in JLT needs the building or owners association NOC and DMCC approval through Concordia. Kitchens, walls and layouts can often change, with drawings.
Apartment renovations in JLT need the building management or owners association NOC, then DMCC approval reviewed through Concordia. Moving a kitchen, changing the layout or removing a wall is possible in many cases, with drawings and, for walls, a structural check. Changes that affect fire safety go to Civil Defence. Facade and balcony changes affect the building and are checked with building management first.
What you need to know
- Kitchen: Can often move; drainage and ventilation are shown on the drawings.
- Layout: New partitions and room changes need drawings.
- Walls: Checked first; some walls carry the building.
- Bathrooms: Waterproofing and drainage.
- Facade and balcony: Checked with building management first.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or owners association NOC
- Existing or as-built drawings of the unit
- Proposed fit-out drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Contractor registration with Concordia
By type of unit
Common apartment changes
We confirm the route for your unit.
| Change | Approval route | Guides |
|---|---|---|
| Move the kitchen Drawings with drainage and ventilation | Building NOC and DMCC via Concordia. | — |
| Remove a wall Structural check | Stamped calculations if allowed. | Wall removal |
| Merge two apartments Structural check and approvals | Openings between units. | Merging apartments |
| Facade or balcony Checked with building management first | Affects the building. | Facade |
| Core drilling Structural check | Slab openings. | Core drilling |
How it works
How we get your JLT approval
1. Review
The unit, the changes and the drawings you have.
2. Drawings
Existing drawings from building management or DMCC, or we survey and redraw.
3. Building NOC
From building management or the owners association.
4. DMCC and Concordia
Fit-out approval, reviewed through Concordia.
5. Civil Defence
Fire safety drawings approved.
6. Works
By a contractor registered with Concordia.
7. COC
Concordia inspection and Certificate of Completion.
Who does what
Who approves it in JLT
Building management
The building management or owners association NOC comes first.
Building NOC first →DMCC through Concordia
DMCC approves the fit-out; Concordia reviews the drawings, inspects the works and issues the COC.
Concordia and DMCC →Structural Solutions
Prepares the drawings and calculations and handles the submissions.
Talk to our engineers →What we prepare
- Renovation drawings
- Structural checks
- As-built drawings
Why JLT submissions get returned
- Drawings that do not match the unit
- Building management NOC missing
- Fire safety changes without DCD approval
- Contractor not registered with Concordia
- Works started before approval
Questions
Questions tenants and owners ask
Do I need a NOC to renovate my JLT apartment?
Yes, from building management or the owners association, then DMCC via Concordia.
What can I change in my JLT apartment?
Layouts, kitchens and bathrooms are often possible with drawings; walls need a structural check.
Can I move my kitchen in JLT?
Often yes, with drawings showing drainage and ventilation.
Can I close my balcony?
It changes the facade, so check with building management first.
Related guides