Can I Remove a Wall in My JLT Apartment or Office?
Sometimes. The wall is checked first: partitions can often go, structural walls usually cannot without a design. Approval comes through the building NOC and DMCC via Concordia.
The short answer
It depends on the wall. A structural assessment checks whether the wall carries the building, using the existing drawings or a site survey. Non-structural partitions can often be removed with approval; structural walls need an engineered solution, if one is possible at all. The works need the building management NOC and DMCC approval through Concordia, with stamped drawings and calculations.
What you need to know
- Partition or structural?: Found from the drawings or a survey.
- Structural walls: Need an engineered solution, if possible.
- Calculations: Stamped and submitted with the drawings.
- No drawings?: We survey and draw the unit.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or owners association NOC
- Existing or as-built drawings of the unit
- Proposed fit-out drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Contractor registration with Concordia
By type of unit
Approvals by type of unit
We confirm the route for your unit.
| Unit | Approval route | Guides |
|---|---|---|
| Office Building NOC, DMCC via Concordia, DCD | Layout, MEP and fire safety. | DMCC fit-out |
| Shop Building NOC, DMCC via Concordia, DCD | Shopfront and signage too. | Shops |
| Restaurant or café Plus DM Food Safety | Kitchen layout. | Restaurants |
| Clinic Plus DHA | Health facility approval. | Clinics |
| Apartment Building or OA NOC, DMCC via Concordia | Renovation works. | Apartments |
How it works
How we get your JLT approval
1. Review
The unit, the changes and the drawings you have.
2. Drawings
Existing drawings from building management or DMCC, or we survey and redraw.
3. Building NOC
From building management or the owners association.
4. DMCC and Concordia
Fit-out approval, reviewed through Concordia.
5. Civil Defence
Fire safety drawings approved.
6. Works
By a contractor registered with Concordia.
7. COC
Concordia inspection and Certificate of Completion.
Who does what
Who approves it in JLT
Building management
The building management or owners association NOC comes first.
Building NOC first →DMCC through Concordia
DMCC approves the fit-out; Concordia reviews the drawings, inspects the works and issues the COC.
Concordia and DMCC →Structural Solutions
Prepares the drawings and calculations and handles the submissions.
Talk to our engineers →What we prepare
Why JLT submissions get returned
- Drawings that do not match the unit
- Building management NOC missing
- Fire safety changes without DCD approval
- Contractor not registered with Concordia
- Works started before approval
Questions
Questions tenants and owners ask
Can I remove a wall in my JLT apartment?
Often yes for partitions; structural walls are checked first.
How do I know if a wall is structural?
From the existing drawings or a site survey and assessment.
Who approves?
Building management NOC, then DMCC via Concordia.