Is shared housing allowed in Dubai Marina, JLT or Downtown?
No. Shared housing in Dubai Marina, JLT or Downtown is not allowed: these areas are not on the Dubai Municipality list.
The short answer
The DM circular (reported by Khaleej Times on 8 October 2026) allows shared housing only in 39 listed areas, mostly in Deira, Bur Dubai, Karama, Al Qusais, Al Nahda, Jumeirah 1, Al Barsha 1 and Al Warqa 1. Dubai Marina, Jumeirah Lakes Towers (JLT) and Downtown Dubai are not on the list, so apartments there cannot be used as shared accommodation. Renting the apartment as a single unit is not affected.

Official sources: Dubai Municipality · Dubai Civil Defence · Khaleej Times report on the DM circular
Shared housing in Dubai Marina: what you need to know
- Allowed areas only: 28 fully and 11 partly allowed areas.
- 5 m² per person: Minimum bedroom area.
- One category: Individual or family, not mixed.
- DCD and DM: Both approvals are required.
What to send us
- Title deed (owner), or tenancy contract with owner NOC (tenant)
- Emirates ID or passport
- Affection plan or site plan
- Existing drawings, if available; we can survey
- Photos of the rooms and facilities
- Trade licence, if a company owns or operates the property
Who does what
From check to permit
The order of the DCD and DM steps can vary; we confirm it for your property.
| Step | Approval route | Guides |
|---|---|---|
| Check the area and category You and us | Confirm the property is in an allowed area, and choose individual or family housing. | Allowed areas |
| Owner NOC (tenants) Owner | A tenant applies with a NOC from the owner. The owner NOC is enough; no other NOC is needed. | Tenants |
| Survey and layout drawings Structural Solutions | Rooms of at least 5 m² per person, plus kitchen, bathroom, dining, recreation and laundry. | Layout drawings |
| Structural check Structural Solutions | Partitions and any added loads are checked by our engineers. | — |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval for the shared accommodation. | DCD approval |
| Shared accommodation permit Structural Solutions → Dubai Municipality | The permit to operate the property as shared accommodation. | The permit |
How it works
How it works
1. Check
Area, category and occupancy for your property.
2. Drawings
Survey and layout drawings to the DM rules.
3. Approvals
DCD approval and the DM shared accommodation permit.
4. Operate
Rent the property as permitted shared accommodation.
Questions
More questions about shared housing in Dubai Marina
Is Business Bay allowed?
Business Bay is not on the list.
Is JVC allowed?
JVC is not on the list.
Which areas are allowed?
See the full list of 39 areas.
Can I rent to one family?
Yes, a single-unit rental is not shared housing.
Related guides
